Laserfiche WebLink
s�s ��� <br /> ' ' SKS ENGINEERS, INC. • ' <br /> CONSULTING ENGINEEAS ' <br /> DECATUR, ILLINOIS <br /> JANUARY, 1998 <br /> (FEE SCHEDULE CONTINUED) I' <br /> SOIL TEST BORINGS <br /> Unit Price Rates for Orilling <br /> and Split-Barrel Sampling at <br /> 2 1/2 to 5-ft intervals <br /> 0 to 30 ft 30 to 60 ft <br /> N-count less than <br /> 60 blows pe� foot 9.75 11.75 <br /> N-cotu►t greater than <br /> 60 blows per foot 11.75 13.75 <br /> Securing Thin-Yall Tube Samples 45.00/Each <br /> Mobitization of Drill Rigs with <br /> 2-man crews to and from site E150.00 minimim or as quoted for specific projects <br /> Hourly Rates for Different Type of Work ' <br /> Dritling and Sempling 5125.00/Hour I, <br /> Winching and Towing 5110.00/Hour <br /> Monitor Well Installation/Developnent f110.00/Hour <br /> Standby Time at Clients Direction S 95.00/Hour j <br /> Two-Man drill crew and service truck I <br /> required for work other than drilling/ , <br /> sampling/well installation 590.00/Hour !� <br /> Extras ' <br /> Incidental meteriats, supplies and other job-related expenses as required to '! <br /> perform the work have not been included in the mobilization costs and will be I <br /> charged at cost plus 15 percent. All subcontract work (towing, clearing, ' <br /> etc.> Will also be cha�ged at cost plus 15 percent. I <br /> EaUIPMENT �I <br /> Car or Pickup S 0.35/Mi. Survey Truck S 6.50/Hr. I <br /> Inspection Truck E 6.50/Hr. Coring Machine w/Crew 8� Truck S 85.00/Hr. <br /> Concrete Cylinder Molds S 1.25/Ea. Per Diem 8 Expenses Cost + 75% <br /> NOTES <br /> All work Will be billed portal to portal. Atl travel outside Decatur at <br /> 0.35/Mile. Overtime work at the Client's request will be at 1.3 times the I <br /> above rates. The fees listed hereon assune monthly billings and prompt <br /> peyment. All �npaid balances over 30 days old will be subject to 1 1/2% per <br /> month (18% anrwal rate) carrying charge. <br /> Paya 2 of 2 <br />