My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 3:53:29 PM
Creation date
4/11/2016 3:53:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-123
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT DOWNTOWN STREET LIGHTING IMPROVEMENTS CITY PROJECT 9813
Approved Date
10/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Project............Downtown Street Lighting Improvements ENGINEER'S ESTIMATE Egizii Electric,Inc. Bodine Electric of Decatur <br /> City Project...................9813 4230 West Main Street 1845 North 22nd Street <br /> Decatur,Illinois 62522 Decatur,Illinois 62526 <br /> Bid Date........................September 28, 1998 <br /> Appareot Low Bidder <br /> Time...............................10:00 a.m. S•/.BID BOND S°/.BID BOND <br /> ITEM PAY TfEM UNTT QTY iJNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> NUMBER PRICE PRICE PRICE <br /> Z8440000 ELECTRIC CABLE IN STREET LIGHT POLE EA 219 $200.00 543,800.00 $231.88 $50,781.72 5297.50 565,152.50 <br /> TOTAL BID AS CORRECTED $43,800.00 � 550,781.72 � $65,152.50 <br /> Percent Over or Under ENGINEERS ESTIMATE 15.94 48.75 <br /> SUPPLEMENTAL PRICES ARE INCLUDED OCCASIONALLY TO ESTABLISH UNTf PRICES. IF <br /> SUPPLEMENTAL TI'EMS ARE INCLUDED,THEY MUST INDICATE THE RESPECTNE UNTf <br /> PRICE OR THE BID WII.L BE DECLARED UNACCEPTABLE. SUPPLEMENTAL 1TEMS ARE NOT <br /> INCLUDED IN THE TOTAL BID PRICE. <br /> SUPPLEMENTAL PAY TfEMS <br /> ITEM PAY ITEM iJNIT QTY iJNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> NUMBER PRICE PRICE PRICE <br /> Z8130001 JiJNCT'ION BOX(REBUII,D) EA 9 $1,000.00 $9,000.00 $1,096.88 59,871.92 $1,135.51 $10,219.59 <br /> Z8130002 JLJNCT'ION BOX(RAISED) EA 5 $1,000.00 $5,000.00 $1,096.88 55,484.40 $826.30 $4,131.50 <br /> 44000600 SIDEWALK REMOVAL SF 500 $6.00 $3,000.00 $5.31 52,635.00 59.75 $4,875.00 <br /> 42400200 PORTLAND CEMENT CONCREI'E SIDEWALK,5-INCI-I SF 500 $8.00 $4,000.00 57.81 53,905.00 $9.96 $4,980.00 <br /> Z8220000 SPLICING OF EXISTING ELECTRIC CABLES EA 150 530.00 $4 500.00 $35.94 SS 391.00 5147.25 $2 087.50 <br /> � <br /> � � <br /> The Apparent Low Bidder is:Egizii El�tric <br /> ����� 9'� �� <br /> aI�w C.Newell,Tr ic Engineer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.