My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-123 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 3:53:29 PM
Creation date
4/11/2016 3:53:29 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-123
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT DOWNTOWN STREET LIGHTING IMPROVEMENTS CITY PROJECT 9813
Approved Date
10/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' *- <br /> ,��f.Df c�a <br /> C <br /> V 7� <br /> '/[LINO�Y <br /> September 28, 1998 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 98-66 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams,Jr., City Manager � <br /> Bruce A. McNabb,P.E.,Director of Public Works � <br /> Matthew C. Newell,P.E., TratTic Engineer���`,/f <br /> V( <br /> 1 <br /> SUBJECT: City Project 9813 <br /> Downtown Street Lighting Improvements <br /> An item on the agenda for the October 5, 1998 City Council meeting is the acceptance of <br /> bids and award of a contract to replace the wiring in the downtown street light poles. <br /> This work will increase the safety and reliability of the City's downtown street li�hting by <br /> replacing the existing cable which is over 30 years old with the cable insulation crumbling in many <br /> places. The work will also renew the splices between the main line cable and the street lighting <br /> cable which will add additional integrity to the lighting system in terms of safety and reliability. <br /> The project plans and specifications were prepared by the Traffic Engineer. The project <br /> was advertised and bids were opened on September 28, 1998. The results of the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Underj <br /> Engineer's Estimate $43,800.00 --- <br /> Egizii Electric, Inc. 50,781.72 15.94% <br /> Bodine Electric of Decatur 65,152.50 48.74% <br />
The URL can be used to link to this page
Your browser does not support the video tag.