My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-106 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-106 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 9:17:18 AM
Creation date
4/12/2016 9:17:18 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-106
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT REHABILITATION OF THE NORTH WATER TREATMENT PLANT LAGOON OVERFLOW STRUCTURES CITY PROJECT 9844
Approved Date
8/31/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ` Page 2 <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 6,800.00 ---- <br /> Otto Baum& Sons, Inc. $ 8,994.00 32.3 <br /> The receipt of one bid exceeding the Engineer's estimate by over 30 percent was a concern to <br /> stai� However, the small contract value, the type of work involved and the state of the local <br /> construction mazket generally contributed to this situation. It was decided by staff that the one <br /> bid was acceptable and that readvertisin� the project for bids would realize minimal, if any, <br /> savings. In addition, the repairs must be made in a time frame to meet commitments to the Illinois <br /> Environmental Protection Agency. Otto Baum & Sons have performed acceptable work on <br /> previous projects for the City. <br /> Staff has met with representatives from Otto Baum & Sons to discuss the project and the <br /> opportunity to save money on the project. In discussion with the contractor's representatives, it <br /> was deternuned that the contractor will be able to do some of the work simultaneously and avoid <br /> having to mobilize for each structure. The work will be done on a time and materials basis for the <br /> not-to-exceed amount of$8,994.00. <br /> Funding for this project will be from the City's Water Fund. <br /> It is recommended by staff that the City Council approve the attached resolution awarding <br /> the contract for the Rehabilitation of the North Water Treatment Plant Overflow Structures, City <br /> Project No. 9844, to Otto Baum & Sons, Inc., as the lowest responsive, responsible bidder in an <br /> amount not-to-exceed of$8,994.00 and that the Mayor be authorized to execute the contract. <br /> City staff will be in attendance at the City Council meeting to answer questions that the <br /> Council members may have. <br /> attch: 1 <br /> cc: Michael J. Jontry, Water Production Maintenance Supervisor <br /> William A. Ratekin, Asst. City Engineer <br /> Kenneth D. Baum, Otto Baum& Sons, Inc. <br /> CP 9844 <br />
The URL can be used to link to this page
Your browser does not support the video tag.