My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-78 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-78 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 10:26:54 AM
Creation date
4/12/2016 10:26:51 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-78
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT CONTRACT FOR SURVEYING SERVICES CITY PROJECT 9809
Approved Date
6/15/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outside Surveying Services for Traffic Signal Project C.P. 9809 <br /> I. General surveying detail needed at all intersections unless otherwise noted: <br /> A. Survey along each leg 100'from the center of the intersection identifying everything within the <br /> rights-of-way unless otherwise noted i.e. all utilities, sidewalks, curb,general layout of traffic/ <br /> parking lanes,trees,existing signal equipment,parking meters and any other items that may interfere <br /> with the installation of underground conduit. To identify curb line, locate back of curb only and <br /> provide size. <br /> B. Julie the area prior to being surveyed to enable the location and identification of all utilities. <br /> C. Locate any properiy pins at or near the intersection. <br /> D. Locate building faces and overhangs near the area being surveyed. <br /> E. Set a minimum of two control points with assumed coordinates (P-K nails or similar). <br /> II. Specific surveying detail needed and intersections to be surveyed: <br /> A. Water/Main -Survey as indicated above including a centerline profile on East Main from Water to <br /> North Main. <br /> B. Water/Wood - Survey as indicated above. <br /> C. Monroe/Wood - Survey as indicated above�vith the following modification to I.A: Survey along <br /> each leg 250' from the center of the intersection. <br /> D. Grand/ Martin Luther King-Survey as indicated above with the following modification to I.A: <br /> Survey along each leg 250' from the center of the intersection. Omit I.C, and I.D. <br /> E. Grand/Jasper-Survey as indicated above with the following modification to I.A: Survey along <br /> each leg 250' from the center of the intersection. Omit I.0 and I.D. <br /> F. Gartield/Martin Luther King-Survey as indicated above with the following modification to I.A: <br /> Survey along each leg 250' from the center of the intersection. Omit I.C, and I.D. <br /> G. Garfield/Jasper-Survey as indicated above with the following modification to I.A: Survey along <br /> each leg 250' from the center of the intersection. Omit I.0 and I.D. <br /> III. Materials provided by the City: <br /> A. Any previous plans of the intersections as required. <br /> B. Illinois Power gas and electrical location sheets for each intersection. <br /> C. TCI cable locations sheets for each intersection. <br /> D. AutoCAD 14 file with a previous traffic signal design and layering format. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.