My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-26 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-26 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:31:51 PM
Creation date
4/12/2016 1:31:50 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-26
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT ELEVATED WATER TANK - SOUTH PHASE I - CP-9735
Approved Date
2/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT APPROACH SUMMARY <br /> TANK 1NDUSTRY CONSLJLTANTS has presented a proven project approach to this project. ' <br /> Our project approach has been successfully utilized on hundreds of similar projects. While it is <br /> very likely that many engineering firms may indicate a similar project approach, it is TIC's exten- i <br /> sive experience that separates us from all other firnzs. , <br /> Cost Savings: One of the primary reasons that an owner should select an engineer is that the <br /> engineer selected will save the owner time and money--through proper planning, project designs <br /> that meet the needs today and tomorrow, and verification of quality workmanship so projects are <br /> constructed in the manner designed. Likewise, one of the most important aspects to TIC's Project <br /> � Approach is that TIC will save the City money. While TIC's fees may not be the least, TIC will <br /> still save the City of Decatur money through: <br /> • Development of a quality model of the system which ��vrll allow better rr formation to be used <br /> in making engineering decisions. The better decisions will undoubtedly result in savings in <br /> initial construction as well as throughout the operation and maintenance of the new tank(s). <br /> • Better site selection. By selecting a better site, significant cost savings can be found. These <br /> savings include: site acquisition costs, site development costs, costs associated with running <br /> water lines and power lines to the site and other infrastructure upgrades, tank construction <br /> costs, and future tank maintenance costs. <br /> • A more complete design memorandum which will provide the basis for a better desigji. Un- <br /> derstanding a11 of the issues associated with new tank design and construction will reduce ini- <br /> tial construction costs as well as reduce future maintenance costs. <br /> • While no dollar figure can be placed upon less frustration and fewer headaches, this is the type <br /> of project TIC delivers. As the City looks at their existing tanks (TIC provided the engineer- <br /> ing for their rehabilitation), the City will see tanks which were last painted and upgraded more <br /> than seven years ago. Yet the tanks are still in impeccable condition and the project is per- <br /> fornung as requested by Decatur and designed by TIC. While other communities continue to <br /> complain about the costs and frustrations associated with tank maintenance, the City of De- <br /> catur continues to enjoy the benefits of a well designed and constructed project. If this is the <br /> type of new tank project the City wants, then continued success with TIC will be an easy deci- <br /> sion. <br /> Sineerity and Interest: TIC has been successfully completing water tank projects for more <br /> than eighteen years. This practice has been sustained with a philosophy of service and quality <br /> which has always been the underlying theme at TIC. Even though technology and regulations in <br /> the industry are in a constant state of flux, we have kept up with these changes and challenges. <br /> The only throw-back to the "good old days" is the concept of personalized services and timeli- . <br /> ness. There are many talented consulting firms available to the City of Decatur, but where we set � <br /> ourselves apart fi-om the normal consulting practice is our professional, yet personal service. <br /> 3-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.