My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-26 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-26 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:31:51 PM
Creation date
4/12/2016 1:31:50 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-26
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT ELEVATED WATER TANK - SOUTH PHASE I - CP-9735
Approved Date
2/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attachments of additional structures to the ta�ik(s) will be addressed. TIC has been <br /> involved in the retrofit of more than 50 existing tanks to provide the basis for cellular <br /> phone antennas as well as emergency response antennas and all of the accompanying <br /> cables and appurtenances. In fact, one installation included the design of a 60 ft tall <br /> structure mounted on the roof of an existing tank to hold more than a dozen different <br /> antennas. TIC will include a discussion of tank modifications which should be in- <br /> cluded in the original design of the tank(s) to avoid significant retrofit for future in- <br /> stallation of these attachments to the tank(s) in the design memorandum. <br /> • OSHA and safety issues associated with the �iew tank(s) tivill be addressed. Since <br /> TIC's staff includes engineers from tank construction contractors, TIC is uniquely ex- <br /> perienced to address specific OSHA and safety issues associated with tank construc- <br /> tion and maintenance which should be included in the new tank design. These issues <br /> will be included in the design memorandum. <br /> • Discharge systems for tcnrk draining will be addressed. The ability to drain the <br /> tank(s) can be the source of a future headache. Developing the piping configuration to <br /> allow for ease in emptying the tank(s) is an important aspect of this project. TIC will <br /> address the issues associated with this design in the design memorandum. <br /> • Design requirements for the painting a�ld logo to match the logo ori the existing tanks <br /> will be addressec� Since TIC developed the design specifications for the painting of <br /> the existing tanks, TIC is very familiar with the requirements of this design. TIC will <br /> provide a narrative discussing the requirements of this design in the design memoran- <br /> dum. <br /> • Altitude valve and bypass system similar to the existing tariks' system will be ad- <br /> dressed TIC will include in the design memorandum a discussion of the altitude valve <br /> and bypass system to allow the new tank(s) to operate similar to the existing tanks. <br /> The tank operation system will control the water level and will respond to sudden <br /> system demand changes. TIC assisted with the retrofitting of a waterworks system <br /> that had tank operation challenges that provided water quality issues in the summer <br /> and tank freezin�cing issues in the winter. Utilizing telemetry, unique controls and <br /> pumping schemes, these challenges were easily overcome. <br /> • Operating serrsitivity and impacts ori the Soi�th Water Treatnre�rt Plc�rrt will be ad- <br /> dressed Because the location of the new tank(s) may affect the operation of the <br /> South Water Treatment Plant and the pumps, any negative impact which the new <br /> tank(s) may have will be addressed in the design memorandum. <br /> • Site security and lighting systems will be addressed. With increasing litigation associ- <br /> ated with injuries from unauthorized access to attractive nuisances like water tanks, <br /> site security is of paramount importance. Therefore, TIC will include a discussion of <br /> site and tank security options which are available to better protect the site(s) and <br /> tank(s) from vandals and other unauthorized persons. _ <br /> 3-6 �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.