My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-05 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-05 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:26:19 PM
Creation date
4/12/2016 2:26:18 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-05
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR SOUTH WATER TREATMENT PLANT INTAKE STUDY CITY PROJECT 9732
Approved Date
1/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 201 Review Existing Information. Information related to existing <br />� structures that may be modified for spill management or access will be <br /> reviewed. This information includes as-built plans and previously <br /> conducted field inspections of highways, bridges, and drainage systems <br /> and the conce tual lan of the Lincoln Park Drive trail east of Lake <br /> p P � <br /> Decatur Dam. <br /> Task 202 Evaluate Improvements. Concepts for constructed <br /> improvements, preventive measures, and programs for preventing or <br /> minimizing the impact of spills or improving access to spill areas will <br /> be developed. Constructed improvements may include temporarily <br /> extending the outfall farther out in the Lake outside the area of <br /> contamination until the spill can be controlled, controlling surface <br /> drainage, improving access to potential spill areas, or restricting logs <br /> and other debris from blocking the water intakes. Constructed <br /> Improvements will be evaluated for effectiveness, constructability, and <br /> relative cost. The results of this task will be the basis of discussion <br /> in Workshop No. 1. <br /> Task 203 Prepare Task Memo. A task memo describing the activities in <br /> Tasks 201 and 202 will be prepared and sent to the OWNER for <br /> distribution seven(7)working days prior to Workshop No. 1. <br /> Task 204 Develop Conceptual Designs and Costs. Conceptual designs and <br /> project costs will be developed for up to three systems of constructed <br /> improvements that will be identified in Workshop No. 1. These <br /> improvements would provide the most cost-effective control of spills <br /> and would improve access to areas where spills are most likely to occur. <br /> Conceptual layouts and planning level estimates of probable project and <br /> 0&M costs will be developed for each system of constructed improvements. <br /> TASK 300 - DEVELOPMENT OF SPILL CONTINGENCY STRATEGY <br /> A general spill contingency strategy that the Public Works Department <br /> would follow in response to spills of material that could affect the <br /> SWTP will be developed. The strategy will recognize potential <br /> ' regulatory requirements and available resources identified in Tasks 104 <br /> and 105. The strategy may include items such as notification of <br /> SLW24:002 A—3 December 15, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.