My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-03 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-03 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:30:01 PM
Creation date
4/12/2016 2:30:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-03
Res Ord Title
AUTHORIZING AGREEMENT FOR JASPER STREET & SOUTHEAST INTERCEPTER SEWER INSPECTION CITY PROJECT SI-9740
Approved Date
1/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br /> TSI RESPONSIBILITIES <br /> A. PROJECT DESCRIPTION <br /> The project is described as follows: <br /> Televised pipeline inspection/survey of#1 Jasper Street sewer(5840 L.F.)and#2 <br /> Southeast Interceptor sewer(5000 L.F.) <br /> Manhole investigation and evaluation of#1 Jasper Street sewer(18 manholes)and#2 <br /> Southeast Interceptor sewer(13 manholes). <br /> B. SCOPE <br /> Services to be provided for the Project are as follows: <br /> TELEVISED PIPELINE INSPECTION/SURVEY <br /> 1. A color television camera capable of insertion into 100% humidity conditions will <br /> be used on this project. The camera head is capable of panning 270° and tilting <br /> 360° and the iris, focus and light source are all remote controlled in order to look <br /> directly at problem areas, as well as up service connections. The camera will be <br /> transported through the lines on a remote controlled transporter at approximately <br /> 30 feet per minute, stopping at problem areas to insure proper logging of data. <br /> 2. A video tape recorder in VHS format as well as 35 MM photos will also be used <br /> to observe and record features and conditions that will assist in the evaluation of <br /> the data collected and become a part of the final report. <br /> 3. Tr�c control and protection for the project shall be in accordance with I.D.O.T. <br /> Highway Standard 701606.01. Daytime operations are proposed for the work. <br /> MANHOLE INVESTIGATION <br /> 1. A physical/visual investigation of each manhole using all necessary safety <br /> equipment. The investigation will include all of items 1 through 8 of the memo of <br /> Raquel L. McCain dated October 27, 1997. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.