Laserfiche WebLink
C. REPORT <br /> T.V. INSPECTION <br /> A report will be prepared documenting the techniques and equipment used and <br /> summarizing the inspection. The report will include the following: <br /> a. Separate sheets for each run or line noting distances and locations of the <br /> following: <br /> -Any structural damage, cracks, broken pipe, etc. <br /> -All service tie-ins and type <br /> - Manhole numbers <br /> - Direction of flow/depth <br /> - Depth and type of debris <br /> -Type of pipe and size <br /> -Color photos of problem areas <br /> b. Evaluation of existing conditions found <br /> c. Video Tape <br /> -Complete on screen data view showing project name, date, continuous <br /> footage to nearest 0.10 ft. from starting manhole number. <br /> - Narration explaining conditions as seen. <br /> MANHOLE INVESTIGATION/EVALUATION <br /> a. Separate form and a drawing for each manhole showing the following <br /> data: <br /> -All dimensions of the manhole <br /> -All sewer line tie-ins and sizes <br /> - Direction of flow/depth <br /> - Depth and type of debris <br /> - Location and type of defects <br /> - Environmental conditions,water and atmosphere temperatures <br /> -Evaluation of existing conditions found <br /> -Color photographs <br /> D. ASSUMPTIONS/CONDITIONS <br /> This Agreement is subject to the following assumptions/conditions: <br /> SCHEDULE <br /> It is anticipated that the T.V. Inspection survey will take place in December, 1997. The <br /> final report will follow 15 days after the inspection. <br /> 3 <br />