Laserfiche WebLink
ROOF BID COMPARISON <br /> Com an Name Cost Warrant Covera e Rate Roof Deck Re air Sk Li hts Comments <br /> Rowley Orig.Bid:$21,560 5 year labor and Basecoat,then No Cost Bid Recommended Will create foam <br /> Prev.Wage:$8466 material topcoat at rate of Sky Light crickets between <br /> Primer(notneeded) $2200 2 gaU 100 Contractor roof drains to <br /> Comparison:$32,226 <br /> prevent ponding. <br /> Total Actual$30,026 <br />' King Lar $50,128.24 Not Specified Center Valley: Time and Material Seals: $175 each Will place <br /> prime,then 1.5 Panel: $575 each polyester mesh <br /> gaU100 between 1�and <br /> 2nd C01tS. <br /> Craftmaster $53,600 Not Specified Prime, then 2.5 $5.00 per sq. foot Recommended <br /> gaU100 (1.5 gal of Sky Light <br /> primer, 1 ga1 top Contractor <br /> coat. <br /> Gates & Johnson $49,000 Not Specified Prime, then 2 No Cost Bid Recommended <br /> coats, rate not Sky Light <br /> s ecified Contractor <br /> Misc. Info: <br /> Rowley is a"Foam Roof Contractor" <br /> Rowley's cost column contains: Ori in�al b_id (bid prior to adding `prevailing wage'), <br /> Prevailin�?wage amount: ,(amount added to original to allow for local prevailing wage) <br /> Primer application (in italics) (This work is not needed nor recommended by Rowley who has been in <br /> contact with the original contractor and the supplier of the original material. The product they would apply <br /> is compatible with the current roof material and coatings) <br /> Com,�arison Bid: (this is to compare "apples to apples") <br /> Total Actual Cost: (this is the actual bid amount) <br />