Laserfiche WebLink
Project............................Sidewalk Curb Ramps for ADA ENGINEER'S ESTIMATE Bodine Services, Inc. Otto Baum 8 Sons, Inc. Christy-Foltr,Inc. '� <br /> City Project...................9727 E. Firehouse Rd. 1788 Hubbard Ave. 740 South Main St <br /> City of Decatur Decatur, IL 62521 Oecatur,�L 62526 P.O.Box 828 . <br /> Engineering Division Decatur,IL 62525 <br /> Bid Date........................July 10, 1997 <br /> Time...............................1:30 p.m. <br /> 5•ti Bld Bond SX Bld Bond 5•�G Bld Bond <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> Aggregate Base Course,CA� TON 5.0 50.00 250.00 30.00 150.00 50.00 250.00 40.00 200•00 <br /> Pwdand Cement Concrcte Sidewalk(5 inch) SF 7755.0 5.00 38,775.00 3.25 25,203.75 4.75 36,836.25 730 56,611.50 <br /> Sawcutting LF 779.0 2.00 1,558.00 2.50 1,947.50 2.00 1.558.00 3.00 2,337.00 <br /> Pavement Removal-PoRlmd Cement ConQete SY 25.0 20.00 500.00 5.00 125.00 40.00 1.000.00 9.00 225.00 <br /> Concrete Sidewalk Renwvsl SF 6925.0 2.10 14,542.50 1.25 8,656.25 1.25 8,656.25 1.00 6,925.00 <br /> Pavement Remwal-Biwmicwus Co�rete SY 88.3 9.00 794.70 5.00 441.50 11.00 97130 5.00 441.50 <br /> Comhinatioa Concxete«ab dt C3wte Removd and Replaxmait I.F 885.0 35.00 30,975.00 20.00 17,700.00 28.00 ?A,780.00 20.00 17,700.00 <br /> Pavanent Patching-Bihuninou+CocKzde(2 inch) SY 88.3 25.00 2,207.50 25.00 2.207.50 34.00 3.002.20 20.00 1.�66.00 <br /> Retaining Wall Remwal-Portland Canrnt Cmixcte LF 40.0 30.00 1,200.00 25.00 1,000.00 30.00 1,200.00 10.00 400.00 <br /> Wock Zone Safety Control EA 22.0 90.00 1.980.00 125.00 2,750.00 • 90.00 1,980.00 150.00 3,300.00 <br /> TOTAI BID AS CORRECTED S92 782.70 60181.50 80 234.00 ' 89 906.00 <br /> PerceM Over or(Under)ENGINEER'S ESTIMATE (35.14 (13.52 (3.10 <br />