Laserfiche WebLink
. � <br /> Project............................LAKE DECATUR DAM IMPROVEMENTS Engineer's Estimate Osage Constructors, Inc. � <br /> Replacement of Hydraulic System 3200 County Rd. 257 <br /> City Project...................8918-D Black&Veatch Futton, MO 65251-3101 <br /> Bid Date........................May 7, 1997 <br /> Time..............................10:00 A.M. 5%Bid Bond <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE <br /> All work except that associated with Section 13100 LS 1.0 581000.00 $581,000.00 679000.00 $679,000.00 <br /> Rehabilitation of Oil Reservoir, Section 13100 <br /> Clean interior and exterior for inspection by Owner LS 1.0 1500.00 $1,500.00 25000.00 �25,000.00 <br /> Paint interior LS 1.0 6850.00 $6,850.00 7500.00 $7,500.00 <br /> Paint exterior LS 1.0 3650.00 $3,650.00 6500.00 $6,500.00 <br /> All other work LS 1.0 25000.00 $25,000.00 11000.00 S11 000.00 <br /> �37,000.00 �50,000.00 <br /> ehabilitation of Pressure Tanks, Section 13100 <br /> Clean interior and exterior for inspection by Owner LS 1.0 3000.00 $3,000.00 45000.00 545,000.00 <br /> Disconnect and reconnect piping for pressure test LS 1.0 3260.00 $3,260.00 4000.00 a4,000.00 <br /> Pressure test tanks LS 1.0 1000.00 $1,000.00 5500.00 $5,500.00 <br /> Remove,clean,and reinstall oil level gauges LS 1.0 2400.00 a2,400.00 7500.00 $7,500.00 <br /> Paint exterior LS 1.0 5890.00 $5,890.00 14000.00 �14,000.00 <br /> Paint interior LS 1.0 10410.00 $10,410.00 17000.00 $17,000.00 <br /> All other work LS 1.0 18040.00 $18 040.00 3500.00 $3 500.00 <br /> $44,000.00 $96,500.00 <br /> Rehabilitation ofHydraulic�clinders, Section 13100 LS 1.0 215000.00 $215,000.00 135000.00 $135,000.00 <br /> nspecified Work LS 1.0 20000.00 $20,000.00 20000.00 $20,000.00 <br /> TOTAL BID AS CORRECTED $897 000.00 $980 500.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 9.31 <br /> PAGE 1 <br />