Laserfiche WebLink
. . <br /> Project............................Conventional Resurfacing ENGINEER'S ESTIMATE DUNN COMPANY LINOIS VALLEY PAVIl�IG CO <br /> City Project...................9707 724 N. Mercer St. P.O. Box 648 • <br /> Section..........................97-00000-01-GM Decatur, IL 62522-1699 Decatur, IL 62525 <br /> Bid Date........................June 26, 1997 <br /> Time...............................10:00 A.M. S�o BID BOND 5°� BiD BOND <br /> Apparent Low Bidder <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE <br /> rea Reflective Crack Control SY 85,000.00 1.05 $89,250.00 1.05 $89,250.00 1.10 $93,500.00 <br /> Bituminous Concrete Surface Course, Class I TON 7,500.00 45.00 $337,500.00 43.95 $329,625.00 44.70 $335,250.00 ' <br /> Levelin Binder Machine Method TON 2,500.00 45.00 $112,500.00 44.50 $111,250.00 44.70 $111,750.00 , <br /> Bituminous Materials CSS-IH Prime Coat GAL 1,500.00 1.10 $1,650.00 1.00 $1,500.00 1.05 $1,575.00 <br /> Bituminous Materials AC20 Prime Coat GAL 25,500.00 1.50 $38,250.00 1.35 $34,425.00 1.40 $35,700.00 � <br /> Prime Coat Aggregate TON 100.00 13.40 $1,340.00 13.50 $1,350.00 14.00 $1,400.00 <br /> Pavement Removal Surface Course As halt SY 3,500.00 8.75 $30,625.00 8.50 $29,750.00 8.25 $28,875.00 <br /> Pavement Removal Surface Couse (Concrete) SY 1,000.00 11.50 $11,500.00 11.25 $11,250.00 12.00 $12,000.00 i <br /> Valve Box EA 2.00 180.00 $360.00 175.00 $350.00 150.00 $300.00 <br /> Manhole Frame& Lid, T 1 EA 2.00 235.00 $470.00 230.00 $460.00 225.00 $450.00 <br /> Valve Box to be Adjusted (Asphalt EA 65.00 105.00 $6,825.00 105.00 $6,825.00 110.00 $7,150.00 <br /> Valve Box to be Ad'usted Concrete EA 3.00 225.00 $675.00 225.00 $675.00 230.00 $690.00 <br /> Manhole to be Adjusted (Asphalt) EA 3.00 170.00 $510.00 170.00 $510.00 165.00 $495.00 <br /> Manhole to be Ad'usted Concrete EA 3 205.00 $615.00 225.00 $675.00 250.00 $750.00 <br /> Mixture for Cracks, Joints&Flangeways TON 30 150.00 $4,500.00 150.00 $4,500.00 150.00 $4,500.00 <br /> TOTAL BID AS CORRECTED $636 570.00 $622 395.00 $634 385.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 2.23 0.34 <br /> The Apparent Low Bidder is: nunn Company <br /> Stephen P. Swansoq City Engineer Date <br />