My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-41 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-41 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 10:46:41 AM
Creation date
4/19/2016 10:46:39 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-41
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT NORTH WATER TREATMENT PLAN REHABILITATION OR REPLACEMENT PROJECT CITY PROJECT 9644
Approved Date
3/31/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Discuss the potential impact on existing shallow wells using <br /> the same water source. <br /> 6. Discuss the impact on treatment process selection. <br /> 7. Provide the following as Supplemental Services if authorized <br /> by City. <br /> a. Provide a final favorability report which expands the <br /> information developed for the favorability evaluation <br /> and includes the preliminary probable construction costs <br /> estimates. <br /> b. Proceed with yield investigation. <br /> c. Provide a design report which includes data collected, <br /> design criteria, construction cost estimates and siting <br /> for the horizontal collector wells. <br /> I . Infiltration Gallery Source Feasibility Study. <br /> 1. Evaluate the feasibility of constructing an infiltration <br /> gallery in the bottom of the lake as a method for replacing <br /> the existing intakes. <br /> 2. Evaluate the feasibility of constructing an infiltration <br /> �allery along the shareline as a ��ethotl for replacing the <br /> existing intakes. <br /> J. Workshops and Meetings <br /> l. Conduct three workshops. The first workshop will be in <br /> conjunction with the kick-off ineeting. The second will be a <br /> screening workshop. The third, a review workshop prior to <br /> development of the draft report. <br /> SLN3:023 A-� April 1, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.