Laserfiche WebLink
TERMS AND CONDITIONS <br /> To assure an understanding of matters related to our mutual responsibilities,these terms and conditions for professional engineeri�g services are made <br /> h <br /> a paR of this agreement for our servioes: ' <br /> AMENDMENTS <br /> This agreement may be amended in writing providing both the Owner and Engineer agree to such modifications. <br /> COMPENSATION FOR ENGINEERING SERVICES <br /> The basis for compensation will be as identified in the agreement. <br /> When"Lump Sum"payment is utilized,it shall include all labor and expenses(for the scope of work as defined in the agreement)incurred by the Engineer <br /> and shall not exceed the fixed payment amount without prior authorization of the owner. <br /> When a"Salary Cost"payment is utilized it shall be computed by a multiplier factor times salary cost plus reimbursable expenses. <br /> The"Salary Costs"means the direct labor and wages paid to all Engineering personnel engaged directly on the work plus the cost of customary and statutory <br /> benefits inGuding social security contributions,unemployment,heaRh,sick leave,vacation,workmans compensation,incentive and holiday pay applicable <br /> thereto. <br /> "Reimbursable Expenses"means the actual expenses incurred directly or indirectly in connedion with the work including but not limited to the following: <br /> Transportation and subsistence,toll telephone calls,telegrams,reprodudion or printing,computer time and outside consultants. <br /> The"Mu�iplier'is a factor for general direct overhead,indirect costs,profit and other costs. The Multiplier factor rate shall be identified in the agreement. <br /> TIME OF PAYMENT <br /> The Engineer may submit monthly statements for services and expenses based upon the proportion of the actual work completed at the time of billing. <br /> Unless provided for otherwise,payments for engineering services will be due and payable thirty(30)calendar days from the issuance of the Engineer's <br /> statement. <br /> LATE PAYMENT <br /> If the Owner fails to make any payment due the Engineer for services and expenses within the time period specified,a service charge of 1'/2°/a per month <br /> will be added to the Owners account. This is an annual rate of 18°h. <br /> LIMITATION OF LIABILITY <br /> The Owner agrees to limit the Engineers liability to the Owner and to all construction contradors and subcontractors where applicable,on this work,for <br /> damages to them,due to the Engineer's negligent acts,errors or omissions,such that the total aggregate liability of the Engineer to all those named shall <br /> not exceed$50,000 or the Engineers total fee for services rendered on this work,whichever is greater. <br /> AUTHORITY AND RESPONSIBILITY <br /> The Engineer shall not guarantee the work of any Contractor or Subcontractor,shall have no authority to stop work,shall have no supervision or control <br /> as to the worlc or persons doing the wodc,shall not have charge of the work,shall not be responsible for safety in,on,or about the job site or have any control <br /> of the safety or adequacy of any equipment,building component,scaffolding,supports,fortns or other work aids,and shall have no duties or responsibilities <br /> imposed by the Strudural Wo�lc Ad. <br /> TERMINATION <br /> This agreement may be tertninated by either party upon written notice. In the event of any termination, the Engineer will be paid for all services and <br /> expenses rendered to tl�e date of tertnination on a basis of salary cost times a multiplier of 1.99(ff not previousy provided for)plus reimbursable expenses, <br /> plus reasonable termination costs. <br /> REUSE OF DOCUMENTS <br /> All documeMs induding drawings and speafications fumished by Engineer pursuant to this Agreement are instruments of his services in respect to the work. <br /> They are not intended or represented to be suitable for reuse by Owner or others except on extensions of this work. Any reuse except for extensions of <br /> this work without specific written verification or adaptation by Engineer will be at Owner's sole risk, and without liability of Engineer, and Owner shall <br /> indem�ify and hold harmless engineer from all claims,damages,losses and expenses induding attomeys fees arising out of or resuRing therefrom. Any <br /> such verification or adaptation will entitle engineer to further compensation at rates to be agreed upon by Owner and Engineer. <br /> ESTIMATES OF COST <br /> Since the Engineer has no oontrol over the cost of labor,materials or equipment or over a Contrador(s)method of determining prices,or over competitive <br /> bidding or maricet conditions,his opinions of probable Project Cost or Construdion Costs that may be provided for herein are to be made on the basis of <br /> his experience and qualifications and represent his best judgement as a desgn professional familiar with the construction industry,but Engineer cannot and <br /> does not guarantee that proposals,bids or the construdion cost will not vary from opinions of probable cost prepared by him. If the Owner wishes greater <br /> assurance as to the Construction Cost,he shall employ an independent cost estimator. <br /> The Engineer agrees to comply with"Section 3 Clause"as shown in the attached Exhibit A. <br />