Laserfiche WebLink
Project............................Traffic Signal Reconstruction: ENGINEER'S <br /> ESTIMATE Rathje Enterprises,Inc. gizii Elechic,Inc. J.F.Edwards Cons6uction <br /> Oakland/Main ba Bodine Electric,Inc. 00 N.MacArihur Blvd. . <br /> MLK/Wood City Eogineering Division 1845 N.22nd Street pringfield,IL 62702 220 S.Chicago St. <br /> MLK/Prairie PO Box 976 PO Box 49 <br /> atur,IL 62525 eseo,IL 61254 <br /> City Project....................9609 <br /> Bid Date.........................December 9, 1996 <br /> 5%BID BOND %BID BOND 5%BID BOND <br /> Time..............................10:00 a.m. <br /> "Math Error Highlighted <br /> PAYITEM TOTAL <br /> UNIT UANTITY IT PRIC TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNTI'PRICE TOTAL <br /> CONCREI'E FOLJNDATION,1'YPE D LF 9 295.00 2,655.00 239.53 2,155.77 251.08 2,259.72 399.00 3,591.00 <br /> CONCRETE FO[JNDATION,1'YPE A LF 36 150.00 5,400.00 118.40 4,262.40 133.38 4,801.68 189.00 6,804.00 <br /> SERVICE INSTALLATION,TYPE B EA 3 500.00 1,500.00 863.28 2,589.84 533.50 1,600.50 670.00 2,010.00 <br /> ELECTRIC CABL.E IN CONDUIT,NO.18,3 PAIIi � 5220 0.80 4,176.00 0.72 3,758.40 0.70 3,654.00 0.70 3,654.00 <br /> TWISTED-SIiIELDED <br /> ELECTRIC CABLE IN CONDUIT,NO.14 7/C LF 1206 1.50 1,809.00 0.87 1,049.22 0.89 1,073.34 0.78 940.68 <br /> ELECTRIC CABLE IN CONDL7TI',NO.14 S/C LF 6846 0.90 6,161.40 0.86 5,887.56 0.80 5,476.80 0.64 4,381.44 <br /> ELECTRIC CABLE IN CONDLITI',NO.14 3/C LF 4805 0.95 4,564.75 0.70 3,363.50 0.69 3,315.45 0.57 2,738.85 <br /> EL.ECTRIC CABI.E IN CONDUIT,N0. 6 1/C LF 60 5.00 300.00 1.56 93.60 1.91 114.60 3.50 210.00 <br /> PVC CONDUIT,AUGERED 3" I.F 654 12.00 7,848.00 12.62 8,253.48 12.85 8,403.90 16.90 11,052.60 <br /> PVC CONDLTIT,AUGERED 2" LF 7'7 10.90 839.30 8.94 688.38 13.20 1,016.40 13.90 1,070.30 <br /> PVC CONDLJff,AUGERED l-1l2" L.F 1379 9.80 13,514.20 8.90 12,273.10 8.06 11,114.74 12.42 17,127.18 <br /> PVC COND[11T IN TRENCH 3" LF 146 9.25 1,350.50 8.55 1,248.30 7.29 1,064.34 14.27 2,083.42 <br /> PVC CONDLJIT IN TRENCH 2" LF 302 5.15 1,555.30 7.44 2,?A6.88 4.68 1,413.36 11.14 3,364.28 <br /> PVC CONDiJff IN TRENCH 1-1l2" LF 141 4.15 585.15 4.16 586.56 5.47 771.27 9.76 1,376.16 <br /> ALVADItZED STEEI.CONDiJTf,PUSHED 3" LF 35 21.50 752.50 15.84 554.40 29.87 1,045.45 18.63 652.05 <br /> GALVANIZED STEEL CONDUIT,PUSFIED 1 1/2" LF 60 16.40 984.00 7.25 435.00 15.15 909.00 14.04 842.40 <br /> PEDESTRIAN PUSH BUITON EA 26 150.00 3,900.00 118.81 3,089.06 152.08 3,954.08 177.00 4,602.00 <br /> _ Page 2 <br />