Laserfiche WebLink
Project............................Traffic Signal Reconshvction: ENGINEER'S <br /> ESTIMATE ihje Enterprises,Inc. Egizii Electric,Inc. J.F.Edwards Conshucrion <br /> Oakland/Main ba Bodine Electric,Inc. 700 N.MacArthur Blvd. Co. <br /> MLK/Wood City Engineering Division 1845 N.22nd Street Springfield,IL 62702 220 S.Clricago St. <br /> MLK/Prairie Box 976 PO Box 49 <br /> tur,IL.62525 Geneseo,IL 61254 <br /> City Project....................9609 <br /> Bid Date.........................December 9, 1996 <br /> 5%BID BOND 5%BID BOND 5%BID BOND <br /> Time..............................10:00 a.m. <br /> "Math Error Hiahli�uhted <br /> PAYITEM TOTAL <br /> UNTI' UANTTI'Y IT PRIC TOTAL UNIT PRICE TOTAL UNTT PRICE TOTAL UNIT PRICE TOTAL <br /> EXPANSION T7E ANCI-IORS 3/4" EA 250 I5.00 3,750.00 13.13 3,282.50 13.00 3,250.00 12.50 3,125.00 <br /> CONCREI'E MEDIAN SURFACE,4" SY 425 35.00 14,875.00 16.28 6,919.00 5.72 2,431.00 15.50 6,587.50 <br /> OMB.CURB 8c GUT"fER,TYPE B-6.06 LF 483 20.00 9,660.00 16.17 7,810.11 12.90 6,230.70 15.40 7,438.20 <br /> CONCRETE MEDIAN SURFACE REMOVAL SY 83'7 9.00 7,533.00 12.92 10,814.04 2.39 2,000.43 12.30 10,295.10 <br /> COMB.CURB 8c GLJTfER REMOVAL LF 570 8.00 4,560.00 8.40 4,788.00 4.16 2,3'II.20 8.00 4,560.00 <br /> SIDEWALK REMOVAL SF 4225 2.00 8,450.00 1.84 7,774.00 2.08 8,788.00 1.75 7,393.75 <br /> RTLAND CEMENT CONCREI'E SIDEWALK 5" SF 4225 5.00 21,125.� 3.99 16,857.75 3.64 13,379.00 3.80 16,055.00 <br /> AVEMENT FABRIC SY 215 7.50 1,612.50 5.78 1,242.70 2.60 559.00 5.50 1,182.50 <br /> RTLAND CEMENT CONCREI'E PAVEMENf 10" SY 215 50.00 10,750.00 ::::;::::;:<::;::;;:::;:+t;�i&'::<:::: ":::'-:'96328 31.72 6,819.80 39.50 8,492.50 <br /> ITUMINOUS CONCRETE SURFACE COURSE, TONS 40 90.00 3,600.00 147.00 5,880.00 145.60 5,824.00 140.00 5,600.00 <br /> C,CLASS I,TYPE 1 <br /> SUB-BASE GRANULAR MATERIAI.,T'YPE B 4" SY 215 7.00 1,505.00 13.13 2,822.95 13.00 2,795.00 12.50 2,687.50 <br /> TRENCH AND BACI�II.L LF 1365 2.00 2,730.00 1.89 2,579.85 2.23 3,043.95 2.70 3,685.50 <br /> GiJLFBOX JLTNCTION EA 10 325.00 3,250.00 250.70 2,507.00 259.60 2,596.00 354.00 3,540.00 <br /> ONCRETE DOUBLE HANDHOI.E EA 3 1700.00 5,100.00 1,259.44 3,778.32 1,543.30 4,629.90 1,657.00 4,971.00 <br /> CONCRETE HANDHOLE EA 13 1000.00 13,000.00 771.67 10,031.71 860.75 11,189.75 1,251.00 16,263.00 <br /> CONCRETE FOUNDATION,TYPE E,24"DIA LF 22 100.00 2,200.00 93.10 2,048.20 88.90 1,955.80 144.00 3,168.00 <br /> ONCRETE FOLJNDAI'ION,TYPE E,30"DIA. LF 110 120.00 13,200.00 97.12 10,683.20 91.70 10,087.00 152.00 16,720.00 <br /> Page 1 <br />