Laserfiche WebLink
. _ � ✓ <br /> Table 1 <br /> PROJECTED LEVEL OF EFFORT AND COST <br /> LAKE SHELBYVILLE ALTERNATIVE ANALYSIS <br /> City of Decatur, Illinois <br /> Harza BWC <br /> Senior Project Project Project Word Proc/ <br /> Task Staff Manager Engineer Engineer Engineer Drafting Total <br /> 1.0 Additional Data Collection 0 0 6 8 6 0 20 <br /> 2.0 Formulation of Options 0 1 8 8 0 4 21 <br /> 3.0 Cost Analysis 1 0 16 8 24 0 49 <br /> 4.0 Report Preparation 1 1 12 4 8 4 30 <br /> Subtotal 2 2 42 28 38 8 120 <br /> Contract Billing Rates($/hr) $125 $110 $80 $70 $65 $45 <br /> Projected Labor Costs ($) $250 $220 $3,360 $1,960 $2,470 $360 $8,620 <br /> Direct Costs <br /> Travel and Lodging $150 <br /> Prints and Reproductions $250 <br /> Computer $200 <br /> Postage, Communication $100 <br /> Subtotal $700 , <br /> Total Estimated Project Cost $9,320 <br />