My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-176 ACCEPTING PROPOSAL
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-176 ACCEPTING PROPOSAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 3:40:27 PM
Creation date
4/22/2016 3:40:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-176
Res Ord Title
ACCEPTING PROPOSAL DATA RADIO, INC.
Approved Date
12/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � II <br /> . + <br /> r. . } <br /> City of Decatur Mobile Data System Acceptance Test Plan ' <br /> Inbound Traffic Test <br /> The inbound traffic test will be conducted by performing the following steps in the <br /> following sequence: <br /> • The test host will be connected to the RF system's BDLC. <br /> � • The test vehicles that are equipped with the 96+MRMs and mobile test <br /> workstations will be located near the transmitter site. - - - - <br /> • A series of test procedures will be executed to verify that the test host,the <br /> BDLC,and the 96+MRM-equipped test vehicles are communicating. <br /> • The test host will open a log file which will be associated with the tower <br /> site. <br /> • The mobile test workstation in each of the 10 vehicles will generate and <br /> pass to the 96+MRMs a series of test messages directed to the test host. <br /> • Each message will consist of 43 characters of user data and will be passed <br /> to the 96+MRMs at a steady rate.At the end of one hour,each of the <br /> mobile test workstations will have passed the messages per hour per <br /> vehicle of inbound traffic,as defined in the Projected Workload,to its 96+ <br /> MRM. <br /> • The test host will record the messages received,as well as the <br /> ACKs/NAKs generated by the BDLC in the tower log file. <br /> • The generation of test messages at the rate described above will continue <br /> for one hour.At the end of one hour,the mobile test workstations will <br /> stop generating test messages and the tower log file on the test host will <br /> be closed. <br /> • The test host will generate a report that will list all test messages that <br /> were successfully received from the mobile test workstations as evidenced <br /> by an ACK message. <br /> • If the total inbound messages per hour per vehicle as determined above <br /> meets or exceeds the total inbound messages per lwur per vehicle shown <br /> in the input model used in the Da'rAxAD�o Projected Workload <br /> attachment previously referenced,the inbound component of the <br /> throughput test will be determined to be successfully completed. <br /> � SUCCESSFUL TEST COMPLETION <br /> Although discussed separately,both the outbound and inbound components of the throughput <br /> test will be conducted simultaneously and successful completion of the overall throughput test <br /> is conditioned upon components handling the required workload. <br /> �iV Il/�R/�V�O" <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.