Laserfiche WebLink
v � ♦ <br /> • j <br /> • � i <br /> R • • I <br /> City of Decatur Mobile Data System Acceptance Test Plan �, <br /> • Generate formatted reports that associate test messages with their II <br /> corresponding ACK/NAK and time stamps <br /> The mobile test workstations will be provided by the City under terms of the contract. ' <br /> The mobile test workstations will be equipped with a serial communications port that <br /> will be used to connect the mobile test workstation to the 96+MRM. The mobile test ', <br /> wpxkstation software will be provided by DATAxA��o. The mobile test will perform the _. . _._____ j <br /> following tasks: �i <br /> • Generate test messages of a preselected size <br /> • Pass these test messages to the 96+MRM at preselected intervals via the ' <br /> serial communications port !, <br /> • Time stamp delivery of the test messages to the 96+MIZM '� <br /> The City vehicles and personnel will be provided by the City as coordinated through the I�, <br /> City project manager. I <br /> TEST PROCEDURE II, <br /> Outbound Traffic Test �i <br /> The outbound traffic test will be conducted by performing the following steps in the ', <br />, following sequence: I <br /> � The test host will be connected to the RF system's BDLC. <br /> • A series of test procedures will be executed to verify that the test host and , <br /> the BDLC are communicating. <br /> � The test vehicles that are equipped with the 96+MRMs and mobile test <br /> workstations will be located near the tower site. <br />, • The test host will open a log file that will be associated with the tower <br /> site. <br /> • The test host will pass a series of test messages directed to the vehicle ,I <br /> equipped with the 96+MRMs and mobile test workstations to the BDLC. <br /> • Each message will consist of characters of user data and will be passed to I <br /> � the BDLC at a steady rate. ��� <br /> • The test host will log the messages as submitted,as well as the i, <br /> ACKs/NAKs received from the 96+MRM/BDLC,in the log file. I <br /> , • The mobile test workstations will log each message received by the 96+ �, <br /> MRMs. I <br /> � The generation of test messages at the rate described above will continue ' <br /> for one hour.At the end of one hour,the test host will stop generating test , <br /> messages and the log file will be closed. '�� <br /> • The test host will generate a report that will list all test messages ' <br /> generated that were successfully delivered to the mobile test workstations ', <br /> as evidenced by an ACK message. <br /> • If the total number of successful outbound messages meets or exceeds the � <br /> test traffic load prediction,the outbound component of the throughput � <br /> test will be determined to be successfully completed. <br /> �L�R/�/O° <br /> 13 <br />