Laserfiche WebLink
f•D <br /> E <br /> �O C�� <br /> � C <br /> v o0 <br /> ��y <br /> '�[LINO�Y <br /> September 10, 1996 I <br /> PUBLIC WORKS MEMORANDUM I <br /> NO. 96-57 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: William B. Sands,Acting City Manager <br /> Bruce A. McNabb,Director of Public Works�v <br /> Stephen P. Swanson, City Engineer� <br /> John A. Smith,Water Production Manager <br /> SUBJECT: Lake Level Monitoring System <br /> City Project 9134 <br /> The Lake Level Monitoring System is designed to record the flows in the Sangamon River <br /> near Monticello, Friends Creek (as it enters the River), Long Creek (as it enters Lake Decatur) <br /> and in the Sangamon River downstream of the Lake Decatur Dam. Radio transmitters will be <br /> installed at each location to transfer the data to the South Water Treatment Plant. The data will <br /> be processed in a software program designed to estimate the impacts to the Lake level based on <br /> the recorded flows. This improved level of data acquisition and method of estimating the Lake <br /> level will greatly improve the operation of the dam gates to control and manage the Lake level <br /> during low and high flow periods. It is a part of the planned Supervisory Control and Data <br /> Acquisition(SCADA) System for the City's Water Production Division. <br /> The plans and specifications for this project were prepared by Black & Veatch for the <br /> City. The project was first bid in April of this year. Only one bid was received. The low bid was <br /> $298,247 as compared to the Engineer's estimate of $105,000. The decision was made to <br /> negotiate with the low bidder, Bodine Electric of Decatur, for a bid acceptable to the City. This <br /> was done because there is a need to complete the project to avoid losing the FCC license issued to <br /> the City for the operations of the radios. In addition, this is considered to be specialty type work <br /> with a limited number of available contractors. The negotiation effort was unsuccessful. The <br /> difference in the adjusted bid from Bodine Electric of Decatur and the Engineer's adjusted <br /> estimate (approximately $60,000) was significant and determined unacceptable to the City. The <br /> Engineers adjusted their estimate to account for unanticipated labor and coordination costs <br /> associated with the four, separate work sites. <br />