Laserfiche WebLink
� �,I <br /> The project was advertised and bids were received and opened on August 7, 1996. The <br /> results of the letting(A bid tabulation is attached) are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate(BG1Vn Alt A $ 800,500.00 --- <br /> Engineer's Estimate(BG1Vn Alt B $ 547,800.00 --- <br /> Parkway Construction Co. Alt A $ 883,450.00 10.36 <br /> Parkway Construction Co. Alt B $ 619,320.00 13.06 <br /> Pressure Concrete, Inc. Alt A $ 1,034,080.00 29.18 <br /> � Pressure Concrete, Inc. Alt B $ 763,974.50 39.46 <br /> Coastal Gunite Construction Co. Alt A $ 1,208,080.00 50.92 <br /> Coastal Gunite Construction Co. Alt B $ 789,804.50 44.18 <br /> After the bid opening, BGM reviewed the qualifications of the low bidder and deternuned <br /> that they are qualified and capable of performing the required work. In the process of reviewing <br /> the contractor's qualifications, there was discussion between BGM and the contractor about the <br /> contractor's interest to do the entire project. They were advised of the City's budget limitations. <br /> The contractor proposed to BGM an option to bypass sewage flows that they had used <br /> successfully on other projects to save money. The proposed option involves the use of an internal <br /> flume and piping system to bypass flows rather than the bypass pumping method designed by <br /> BGM. The savings result from not having to rent and operate pumps for an extended period of <br /> time. The alternate method involves a greater level of risk to the contractor due to the possibility <br /> of a washout, but is one they would be willing to accept. The contractor offered a deduction of <br /> $85,120 for Alternate A and $12,850 for Alternate B if the City was interested in the proposed <br /> bypass option. <br /> The bypass option was discussed with the Sanitary District of Decatur which accepts <br /> sewage from this sewer and the alternate is acceptable to them. Mr. Gene Henry of the Sanitary <br /> District of Decatur has commented on several occasions that the City should proceed to <br /> rehabilitate the entire line at this time. He has been continuously supportive and cooperative <br /> through the design process to help minimize costs to the City. This includes approving the use of <br /> the proposed bypass option. <br />