Laserfiche WebLink
This project will also consist of overlaying portions of 27`h Street and Ocean Trail Road along the <br /> railroad next to US Rte 36. This work will level the approaching pavement adjacent to the railroad <br /> tracks to create a smoother transition when crossing the tracks. These improvements are a part of <br /> the stipulated agreements with the Illinois Commerce Commission (ICC) and CSX Transportation <br /> to make safety improvements at these two crossings. In total, 3.87 lane miles of the City's 825 <br /> total lane miles will be rehabilitated as part of this project. <br /> The annual paving projects generally include a significant amount of patching to repair failed <br /> street sections that are becoming more prevalent throughout the City as capital improvement funds <br /> devoted to pavement maintenance are reduced. <br /> The pro osed street list for Street Restoration is as follows (see attached location ma s): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles <br /> Jasper Street Cantrell St Wood St Mill and Overlay 2,638 2.00 <br /> Mound Road Spring Creek Woodford St Mill and Overlay 1,918 1.82 <br /> Brid e(West) <br /> 27`h Street CSX Railroad 25 feet north of Overlay 25 0.01 <br /> railroad <br /> Ocean Trail CSX Railroad 103 feet east of Overlay 103 0.04 <br /> Road railroad <br /> Total Length 4,556 3.87 <br /> The ro osed locations for atchin as art of the Street Restoration ro'ect are as follows: <br /> Quantity <br /> Street Location (Square <br /> Yards <br /> Wood Street Between MLK Jr.Dr. and Jasper St. 688 <br /> Monroe Street Between Eldorado St. and Leafland Ave. 1,295 <br /> Oakland Avenue 1155 N.Oakland Ave. 125 <br /> N. Country Club Road Between US Rte 36 and Airport Rd. 506 <br /> Total Quantity 2,614 <br /> Proposed 2016 Concrete Street Improvement Project <br /> The second resolution appropriates $300,000 in State MFT funds for concrete street work for the <br /> proposed 2016 Concrete Street Improvement project, City Project 2016-11. The Concrete Street <br /> Improvement project will reconstruct a portion of MacArthur Road between Dancey Court and the <br /> Bridge over Stevens Creek. Reconstruction includes the complete removal of the existing <br /> pavement down to its base, restoring or replacing the base material and putting new concrete <br /> pavement on top. <br /> Page � 2 <br />