Laserfiche WebLink
1. Stormwater Problem Area Prioritization <br /> 2. Regulation, Standards, and Policies <br /> 3. Stormwater Expenditures and Funding Mechanisms <br /> In April, 2014, the City Council approved the creation of a Stormwater Utility to provide a dedicated <br /> funding source to improve known drainage problems and to improve maintenance on existing <br /> stormwater facilities. In addition to providing for rapid response work for storm sewer problems, the <br /> 2016 Miscellaneous Sanitary & Storm Sewer Improvement Project will address some of items 1 and 2 <br /> above. <br /> Project Description <br /> The 2016 Miscellaneous Sanitary & Storm Sewer Improvement Project works to resolve sanitary and <br /> storm sewer concerns as they are identified through televised inspections, routine maintenance and <br /> public observation. This project enables the City to respond in a rapid manner as problems within the <br /> sanitary and storm sewer system arise and must be addressed quickly. Having unit bid prices in place <br /> for sewer repairs enables the City to move rapidly to address collapsed pipe or sink holes as they are <br /> located in the sewer system and before they turn into major public problems. This also reduces the <br /> number of emergency time and material repair contracts that must be brought before the City Council. <br /> The 2016 Miscellaneous Sanitary & Storm Sewer Improvement project will repair both storm and <br /> sanitary sewers under one contract. All the repair costs at each location will be separated between storm <br /> and sanitar im rovements and will be aid for under the Sewer Fund sanita sewer work) or <br /> Y P P � i`Y <br /> Stormwater Fund (storm sewer work). Approximately 75% of the project is expected to be sanitary <br /> sewer related and 25% of the project storm sewer related. <br /> Public Letting Results <br /> The project specifications were prepared by the Public Works Department. The project was advertised <br /> Wednesday, May 11, 2016, and bids were opened on May 24, 2016. The results for the letting are as <br /> follows: <br /> Compared to Engineer's Est. <br /> Bidder Bid Price Over/Under <br /> Entler Excavating Company,Inc. $396,130.00 (8.89%) <br /> Burdick Plumbing&Heating Company, Inc. $424,580.00 (2.35%) <br /> Petersburg Plumbing&Excavating No Bid ----- <br /> ICD Ironhorse, Inc. No Bid --'-- <br /> En ineer's Estimate $434,795.00 ----- <br /> Four contractors took out bid packages and two contractors submitted a bid proposal for the 2016 <br /> Miscellaneous Sanitary& Storm Sewer Improvement Project. Entler Excavating Company, Inc. <br /> provided the lowest responsive and responsible bid at 8.89%below the Engineer's Estimate. <br /> Entler has successfully completed storm and sanitary sewer projects for the City and adheres to the <br /> prevailing wage rate requirements of the State of Illinois. Staff recommends that the City Council <br /> approve a contract with Entler Excavating Company, Inc. to perform the 2016 Miscellaneous Sanitary& <br /> Storm Sewer Improvement Project. <br /> Page � 2 <br />