Laserfiche WebLink
� GENERAL CONDITIONS <br /> rGC-2 CLEAN UP <br /> The Contractor shall at all times keep the premises free from accumulations of surplus <br /> � excavated material, waste material or rubbish caused by their employees or work. <br /> Upon completion of the work, the Contractor shall remove all their rubbish from and about <br /> ' the structures, buildings, and premises, also all their tools, equipment, scaffolding and surplus <br /> materials, and shall leave their work clean, ready for use. In case of dispute, the Owner may <br /> remove the rubbish and surplus materials and charge cost of removals to the Contractor or separate <br /> � contractors, if any, in proportion to amounts determined by the Engineer to be just. <br /> ' GC-3 CONSTRUCTION STAKING <br /> The Engineer shall provide basic line and grade staking for construction. Such basic line <br /> ' and grade shall be limited in general to: <br /> (1) not more than two base lines (generally perpendicular to each other) and one bench <br /> mark for a building, a plant site or a major structure; and <br /> � <br /> (2) centerline stakes and offset grade stakes, where applicable, at all changes in direction, <br /> ' manhole location, special structure, or similar critical location, together with bench <br /> marks, as may be necessary, along the line of work for utility distribution and <br /> transmission lines. <br /> ' Any additional (detailed) construction staking shall be provided by the Contractor, who I�' <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> ' Engineer. Detailed construction staking shall generally include such items as slope stakes, <br /> intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> ' grades, and similar control data required to execute the work under this contract. <br /> The Contractor shall furnish all marking paint, stakes, hubs, lath or similar materials <br /> ' necessary for additional (detailed) construction staking, and shall provide manual assistance <br /> (rodmen) to assist the Engineer in checking or confirming the detailed staking, to whatever extent <br /> the Engineer deems necessary. Such checking, or the absence of it, by the Engineer shall in no <br /> ' way relieve the Contractor from full responsibility for the accuracy and adequacy of the detailed <br /> construction stalting. <br /> ' All costs of materials and labor occasioned by the Contractor's responsibilities as listed <br /> above, shall be borne by the Contractor and shall be included in the respective bid prices of the <br /> various items work. <br /> � <br /> , <br /> � <br /> ' 32 <br />