� <br /> GENERAL CONDITIONS <br /> GC-4 CONTRACT WARRANTY ' <br /> The Contractor shall guarantee all materials and equipment furnished and work performed � <br /> for a period of one (1) year from the date of substantial completion. The Contractor warrants and <br /> guarantees for a period of one (1) year from the date of substantial completion of the system that <br /> the completed system is free from ali defects due to faulty materials or workmanship and the ' <br /> Contractor shall promptly make such corrections as may be necessary by reason of such defects, <br /> including the repairs of any damage to other parts of the system resulting from such defects. The <br /> Owner will give notice of observed defects with reasonable promptness. In the event that the � <br /> Contractor should fail to make such repairs, adjustments or other work that may be made <br /> necessary by such defects, the Owner may do so and charge the Contractor the cost thereby <br /> incurred. The Contract Bond shall remain in full force and effect through the guarantee period. ' <br /> GC-5 CONTRACTOR AVAILABILITY <br /> At all times when work is being performed (by Contractor himself or subcontractor), the , <br /> prime Contractor shall have on the job site someone in their direct employ who is capable of <br /> meeting with the Engineer and making decisions. If authorized by the Engineer, this condition ' <br /> may be satisfied by having a telephone number or someone who satisfies the above requirements. <br /> GC-6 COORDINATION , <br /> Cooperation between the Cantractor, City and Property Owners is imperative. The <br /> responsibility and cost to maintain access is borne by the Contractor. The costs for temporary � <br /> walks and driveways if necessary are to be incidental to the related bid items unless specifically <br /> paid as a separate item. <br /> GC-7 DUST CONTR�L ' <br /> As a part of their construction obligation,the Contractor shall make every reasonable effort � <br /> to control dust throughout the construction area. Dirt, sand or other materials scattered over <br /> traveled areas shall be disposed of by sweeping, flushing or other appropriate measure. <br /> Temporary surfacing shall be continually maintained to avoid loose materials or dust pockets. ' <br /> GC-8 ESTIMATED QUANTITIES AND LOCATION CHANGES <br /> The uantities for this 'ob are estimates onl . These estimated quantities are used for , <br /> Q J Y <br /> establishing unit prices. The City reserves the right to increase, decrease, or omit any of the <br /> estimated quantities in this project. No additional compensation will be allowed for these , <br /> changes. <br /> � <br /> ' <br /> � <br /> 33 , <br />