Critical Sewer Expected Construction <br /> Lake Shore Drive Sewer Completed Summer 2014 <br /> Union Street Sewer Completed Summer 2015 <br /> 7th Ward Sewer Fa112016— Summer 2018 <br /> McKinley Avenue Sewers Spring 2018 — Summer 2019 <br /> 7tn Ward Sewer and 7th Ward Relief Sewer <br /> The 7th Ward Sewer was built around 1905 to serve growing industrial, commercial, and residential <br /> development. As the name suggests, it hearkens back to the time when the City was divided into wards. <br /> The sewer begins near Leafland and Edward Street and flows south and west, passing through Millikin <br /> University in what was originally a natural valley that has since been filled in to accommodate the <br /> university's expanding needs. The 7th Ward Sewer flows west from Millikin to a junction structure in <br /> Fairview Park, and then continues roughly south to the 7th Ward Combined Sewer Overflow facility , <br /> owned by the Sanitary District of Decatur, located near the far west end of Sunset Avenue. The original <br /> sewer was a combination of monolithic concrete and brick pipe varying from 36" to 56" diameter. <br /> The 7th Ward Relief Sewer begins at King and Pine Streets and flows south and west, generally <br /> following the alignment of the 7`h Ward Sewer. The Relief Sewer was completed in 1942 and <br /> constructed of 60" to 84" diameter reinforced concrete pipe to both increase sewer capacity through the <br /> Millikin University area and to help relieve upstream flooding issues. The Relief Sewer and the 7th <br /> Ward Sewer connect to the same junction structure in Fairview Park which then travels south to the 7`h <br /> Ward Combined Sewer Overflow facility. Both sewers are laid out on the attached drawings. <br /> Appendix B contains selected inspection photos detailing the general condition of the 7`h Ward Sewer. <br /> Project Funding Through the Water Pollution Control Loan Program <br /> The passage of an ordinance authorizing a loan agreement to borrow funds from the Illinois Water <br /> Pollution Control Loan Program is one of the final steps in securing an IEPA low interest loan. The loan <br /> rate is expected to be 1.86%. The ordinance addresses the funding for the project and assures that the <br /> City is able to repay the loan over a 20 year period beginning at the substantial completion of the <br /> project. The funds included in the loan request are summarized in the following table: <br /> Work Item Project Estimate <br /> Design Engineering* $156,500 <br /> Construction $12,905,140 <br /> Construction Contingency $1,290,520 <br /> Construction Engineering $944,000 <br /> Total Estimated Project Cost $15,452,660 <br /> Total Loan Requested $15,452,660 <br /> * The Design engineering costs originally included both McKinley <br /> and 7th Ward sewer design. Since the project is now separated, this <br /> reflects 1/2 of the authorized $313,000. <br /> Page � 3 <br />