My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-30 AUTHORIZING THE CITY TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
COD
>
City Clerk
>
ORDINANCES
>
2016
>
2016-30 AUTHORIZING THE CITY TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:09:00 AM
Creation date
6/13/2016 11:08:51 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2016-30
Res Ord Title
AUTHORIZING THE CITY OF DECATUR OF MACON COUNTY, ILLINOIS TO BORROW FUNDS FROM THE WATER POLLUTION CONTROL REVOLVING LOAN FUND
Approved Date
6/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Critical Sewer Expected Construction <br /> Lake Shore Drive Sewer Completed Summer 2014 <br /> Union Street Sewer Completed Summer 2015 <br /> 7th Ward Sewer Fa112016— Summer 2018 <br /> McKinley Avenue Sewers Spring 2018 — Summer 2019 <br /> 7tn Ward Sewer and 7th Ward Relief Sewer <br /> The 7th Ward Sewer was built around 1905 to serve growing industrial, commercial, and residential <br /> development. As the name suggests, it hearkens back to the time when the City was divided into wards. <br /> The sewer begins near Leafland and Edward Street and flows south and west, passing through Millikin <br /> University in what was originally a natural valley that has since been filled in to accommodate the <br /> university's expanding needs. The 7th Ward Sewer flows west from Millikin to a junction structure in <br /> Fairview Park, and then continues roughly south to the 7th Ward Combined Sewer Overflow facility , <br /> owned by the Sanitary District of Decatur, located near the far west end of Sunset Avenue. The original <br /> sewer was a combination of monolithic concrete and brick pipe varying from 36" to 56" diameter. <br /> The 7th Ward Relief Sewer begins at King and Pine Streets and flows south and west, generally <br /> following the alignment of the 7`h Ward Sewer. The Relief Sewer was completed in 1942 and <br /> constructed of 60" to 84" diameter reinforced concrete pipe to both increase sewer capacity through the <br /> Millikin University area and to help relieve upstream flooding issues. The Relief Sewer and the 7th <br /> Ward Sewer connect to the same junction structure in Fairview Park which then travels south to the 7`h <br /> Ward Combined Sewer Overflow facility. Both sewers are laid out on the attached drawings. <br /> Appendix B contains selected inspection photos detailing the general condition of the 7`h Ward Sewer. <br /> Project Funding Through the Water Pollution Control Loan Program <br /> The passage of an ordinance authorizing a loan agreement to borrow funds from the Illinois Water <br /> Pollution Control Loan Program is one of the final steps in securing an IEPA low interest loan. The loan <br /> rate is expected to be 1.86%. The ordinance addresses the funding for the project and assures that the <br /> City is able to repay the loan over a 20 year period beginning at the substantial completion of the <br /> project. The funds included in the loan request are summarized in the following table: <br /> Work Item Project Estimate <br /> Design Engineering* $156,500 <br /> Construction $12,905,140 <br /> Construction Contingency $1,290,520 <br /> Construction Engineering $944,000 <br /> Total Estimated Project Cost $15,452,660 <br /> Total Loan Requested $15,452,660 <br /> * The Design engineering costs originally included both McKinley <br /> and 7th Ward sewer design. Since the project is now separated, this <br /> reflects 1/2 of the authorized $313,000. <br /> Page � 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.