Laserfiche WebLink
As is common with the Water Pollution Control Loan Program, the actual loan document will not be <br /> fully written until a contract has been awarded by the City Council and a bid amount is approved by the <br /> IEPA. At that point, the agreement authorized by the attached ordinance will be signed by the City <br /> Manager and the loan activated. The contractor will then be given a notice to proceed. <br /> Construction Engineering Services <br /> The IEPA requires that projects being supported by the Water Pollution Control Loan Program be <br /> provided with project oversight by qualified resident engineers that are familiar with the sewer <br /> i rehabilitation work being proposed. BGM is very familiar with the rehabilitation processes proposed for <br /> the 7�h Ward Sewer Rehabilitation Pro�ect. BGM completed the Facilities Plan that identified the work <br /> to be done and then created preliminary and final designs for the project in separate contracts with the <br /> Cit . Their service as the ro'ect mana ers for this work is crucial. <br /> Y P J g <br /> The professional services agreement with BGM includes the following work items: <br /> 1. Assist the City during the bidding process. <br /> 2. Provide technical job site observation. <br /> 3. Prepare and approve pay estimates, change orders and other records. <br /> 4. Safeguard the City against defects and deficiencies on the part of the Contractor. <br /> 5. Conduct final review of the project and prepare final papers and reports. <br /> 6. Revise contract drawings to reflect field changes. <br /> 7. Review and approve shop drawings and Contractor submittals. <br /> 8. Review and check all reports by testing laboratories. <br /> 9. Assist the City if providing all documentation related to the loan program regulations. <br /> POTENTIAL OBJECTION: None <br /> INPUT FROM OTHER SOURCES: Illinois Environmental Protection Agency; Bainbridge, Gee, <br /> Milanski, and Associates, Inc. <br /> STAFF REFERENCE: Richard Marley, Public Works Director and Matt Newell, City Engineer. <br /> Richard Marley will be in attendance at the City Council meeting to answer any questions of the Council <br /> on this item. <br /> ANTICIPATED SCHEDULE: <br /> IEPA Approves the City's Facilities Plan February 4, 2013 <br /> Plans and Specifications Submitted to the IEPA June, 2016 <br /> City Council Approves IEPA Loan Agreement June 6, 2016 <br /> Advertise for Bids July, 2016 <br /> IEPA Construction Permit Issued July, 2016 <br /> Pre-Bid Conference July, 2016 <br /> Bids Opened by the City August, 2016 <br /> City Council Receives and Approves Bids September, 2016 <br /> The Loan is Authorized by the IEPA November, 2016 <br /> Page � 4 <br />