Laserfiche WebLink
condition of the streets based on the biannual inspections, historical condition, surface type (i.e. brick, <br /> concrete, asphalt, etc.), average daily traffic, and traffic type (i.e. trucks, cars, etc.). This data is then <br /> paired with available funding and is used as a basis to aid the Public Works Department in the <br /> preparation of the City's yearly street improvement program. Staff then determines what type of <br /> improvement would be appropriate for each street. <br /> Project Description <br /> The 2016 Intergovernmental Microsurfacing project is a joint project between the City of Decatur, <br /> Macon County, Village of Mt. Zion, Village of Long Creek, Hickory Point Township, and Long <br /> Creek Township. Microsurfacing is focused on prolonging the life of pavements with moderate <br /> deterioration. It is designed to protect the pavement surface and slow deterioration thereby delaying <br /> the need of more expensive treatments such as mill and overlay or reconstruction. When <br /> microsurfacing is combined with a chip seal, (called a"cape seal")the pavement is further benefited <br /> by providing another layer of protection. When performed at the right time with only moderate wear <br /> on the street, microsurfacing treatments can last up to 5 years with cape seals lasting longer than that. <br /> The City's portion of the intergovernmental project will include portions of the Greendell <br /> Neighborhood and a section of Boiling Springs Road. See attached location maps for location <br /> information. Hickory Point Township plans to place a cape seal on its portion of Boiling Springs <br /> Road and the City will pay for the 837 foot portion that is in the City. <br /> In 2015 the City appropriated $140,000 to perform a microsurfacing project on its own. When bids <br /> came in higher than what was considered reasonable, the City rejected the bids and delayed the <br /> project in order to add it to this year's intergovernmental project. The City is the lead agency as <br /> designated in the intergovernmental agreement and must appropriate the full amount for the cost of <br /> the project. The City will be responsible for paying the contractor and the other participating <br /> agencies will reimburse the City's State Motor Fuel Tax Fund for their portions of the work in <br /> accordance with the approved agreements. The City's portion of the contract amount is $113,351.65. <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division in cooperation with <br /> the other participating agencies, and approved by the Illinois Department of Transportation(IDOT) <br /> for the use of State Motor Fuel Tax funds. The project was advertised on Apri120 and 27, 2016, and <br /> bids were opened on May 4, 2016. The results of the letting are as follows (bid tabulation attached): <br /> Bidder Bid Price Compared to Engineer's Est. <br /> Over (-Under) <br /> Microsurfacing Contractors, LLC $823,325.60 (20.52%) <br /> A.C. Pavement Striping Co. $870,00222 (16.01%) <br /> Missouri Petroleum Products Co., LLC $924,829.41 (10.72%) <br /> Engineer's Estimate $1,035,860.57 ------ , <br /> Four contractors took out bid packages and three submitted a bid proposal for the 2016 <br /> Intergovernmental Microsurfacing Project. Microsurfacing Contractors, LLC provided the lowest <br /> responsive and responsible bid at 20.52%below the Engineer's Estimate. <br /> Page � 2 <br />