My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-53 TO APPROPRIATE MOTOR FUEL TAX FUNDS FOR LIGHTING COMPONENT REPLACEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-53 TO APPROPRIATE MOTOR FUEL TAX FUNDS FOR LIGHTING COMPONENT REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:50:38 AM
Creation date
6/13/2016 11:50:06 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-53
Res Ord Title
TO APPROPRIATE MOTOR FUEL TAX FUNDS FOR LIGHTING COMPONENT REPLACEMENT ON U.S. ROUTE 36 BRIDGE OVER LAKE DECATUR BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE CITY PROJECT 2015-01
Approved Date
5/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Memorandum <br /> NO. 2016-20 <br /> DATE: May 4, 2016 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Tim Gleason, City Manager <br /> Richard G. Marley, P.E., Public Works Director <br /> SUBJECT: U.S. Route 36 Bridge Lighting Replacement Project, City Project 2015-01, <br /> Section No. 15-00501-00-LT <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached resolutions: <br /> 1. Resolution appropriating $60,000 in State Motor Fuel Tax funds for the U.S. 36 Bridge <br /> Lighting Replacement Project. <br /> 2. Resolution awarding the contract for the U.S. Route 36 Bridge Lighting Replacement <br /> Project, City Project 2015-01, to Bodine Electric of Decatur, as the lowest responsible <br /> bidder in the amount of$60,000 and that the Mayor be authorized to execute the contract <br /> and the City Clerk to attest. The resolution represents an expenditure of$49,241.03 as the <br /> low bid plus $10,758.97 for project contingencies. <br /> PRIOR COUNCIL ACTION: <br /> There has been no prior Council action on this item. <br /> BACKGROUND: <br /> The condition of the lighting conduit and wiring along the edge of the U.S. Route 36 Bridge over <br /> Lake Decatur has deteriorated over time to the point that it cannot be serviced, but will need to be <br /> replaced. Some other components, such as the street light heads and the lighting controller have also <br /> aged to the point that replacing them is more economical that trying to service them. <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division and approved by <br /> the Illinois Department of Transportation (IDOT) for the use of Motor Fuel Tax funds. The project <br /> was advertised on April 20 and 27, 2016, and bids were opened on May 4, 2016. The results of the <br /> letting are as follows (bid tabulation attached): <br /> Page � 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.