My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 10:28:36 AM
Creation date
6/29/2016 8:16:16 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2016-76
Res Ord Title
AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGEMENT WITH DEWBERRY ARCHITECTS, INC. FOR THE FIRE FACILITY REHABILITATION INITIATIVE
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.1.4'i'he Architect shall noc be responsible for an Owner's directive or substitution made without the Architect's <br /> approval. <br /> § 3.1.5'1'he Architect shall,at appropriate times,contact the governmental suthorities required to approve the <br /> Construction Documents and the entities providins utility services to the Project. In desi�ning the Aroject,the <br /> Architect shall respond to epplicable design requirements imposed by such governmental autharities and by such <br /> entities providing utility services. <br /> § 3.1.6 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents <br /> required for the approval of govemmental authorities having jurisdiction over the Project. <br /> § 3.2 SCHF.MATIC OESIGN PHASE S�RVICES <br /> § 3.2.1 The Architect shall review with Owner the progrsrm and other information fumished by!he Owner(prepared <br /> by Architect unda separate agreement),and shall review Iaws,codes,and regulations applicable to the Architect's <br /> s�rvices. (Pro�ram valida�ion,adjustments to intemal functions and space allowances,and final determination af <br /> the project square foote�e will be finalized within thirty(34}days of the Project Kick-Off Meeting.) <br /> § 3.2.2 The Architect shall prepare a preliminary evaluation oFlhe Owner's program,schedule,budget for the Cost <br /> ofthe Work,Project site,ar�d thc proposed procurement or delivery method and other Initial lnformation,each in <br /> terms of the other,to ascertain the rec�uirements of the Project.'The Architect shall notify the Owrier of(1)any <br /> inconsistencies discovered in thc informalion,and(2)other information or consulting services that may be <br /> reasonably needed for the Project. <br /> § 3.2.3 The Architect sha11 present its preliminary evaluation to the Owner and shall discuss with the Ovmer <br /> alternative approaches to design and construction of the Project,including the feasibility of incorporating <br /> environmer�telly responsible design appromches.'Ihc Architect shall reach an understanding with the Ownec <br /> regarding the requirements of the Project. <br /> § 3.2.4 Based on the Project's requirements ageed upon with the Owner,the Architect shall prepare and present for <br /> the Owner's approvai a preliminary desi�n illustrating the scale and relationship of the Project components. <br /> § 3.2.5 Based on the Owner's approval of thc pref iminary design,the Architect sha11 prepare Schematic Design <br /> Documents for the Owner's approval.The Schematic Desibm Documents shall consist of drnwings and ather <br /> documents including a site plan,if appropriatc,and prel iminary building plans,sections and elevations;and may <br /> include some combination of study models,perspective sketches,or digital modeling.Areliminary selections of <br /> major building systems and construction materials shall be noted on the drawings or described in writing. <br /> § 3.2.5.1 The Architect shali consider ecrvironmentally responsible design alternatives,such as materia! choices and <br /> building orientation,together with other considerations based on program and sesthetics,in developing a design that <br /> is consistent with the Owner's program,schedule and budget for the Cost of the Wak.The Owner may obtain other <br /> environmentally responsibte design sc7vices under Article A. <br /> § 3.2.5.2 The Architect shall consider the value of alternative materials,building systems and equipment,together <br /> with other considerations based on prcr�-em and aesthetics in developing a design for the Project that is consistent <br /> with the Owner's program,schedule and budget for the Cost of the Worl:. <br /> § 3.2.fi The Architect shall submit to the Owner an estimate of the Cost of the Work prepared in accordance with <br /> Sectioo 6.3. <br /> § 3.2.7'rhe Architect shall submit the Schematic Design Documents to the Owner,and request the Owner's <br /> app►oval. <br /> § 3.3 DESIGN DEVELOPNiE�lT PHASE SERVIC�S <br /> I § 3.3.1 Based on the Owner's approval of the Schematic Design Documents,and on the Owner's autfzori7ation of <br /> eny adjustments in the Project requirements and the budget for the Cost of the Work,the Architect shell prepare <br /> InIL NA Oocum�nt 8101*"—20G7�Memerly B761"'—189T).Capy�lpht O 1974.1878,7987,1987 end 2007 by The Amerlean Instiode af Architects.All righb <br /> ns�rv�d.1fVARNING:Thls AIA' Document Is protected by U.S.Copyrlght Law and IMemational 7reatiee.Unauthorized reproductlon or dletributfon 4 <br /> of thls AIA� Document,or any portlon o(it,may resuft in aevare civit and crlminal panaltlea,end wlll be prosecuted to lha mazimum axtent poaalblo <br /> � under the law TNs dxumant was pioduead by AUl soRwaro at 11.27.15 on 06108f2016 under Order No 85637Q9714_t wh{ch e�lree on 071012018,and in / <br /> nol tor resale t <br /> Us�r Notea: (1937�36J71) / <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.