Laserfiche WebLink
Desi�n Development Documents for the Owner's approval.The Design Devclopment Documents shaIt illustrate and <br /> describe the development of the approved Schematic Design Documents snd st�a11 cansist of drawin�s and other <br /> documents including pEans,sections,elevations,typical construction details,and dia�ammatic Isyouts of building <br /> systems to fix and describe the size and charscter of the Project as to architectural,structural,mechanical,electrical <br /> and plumbing systems,and such other elements as may be appropriate.'i�e Design Develapment Documents shall <br /> also include outline spscifications that identify major materials and systems and establish in general their qualiry <br /> levels. <br /> § 3.3.2 The Architect shall update the estimate of the Cost of the Work. <br /> � § 3.3.3 The Architect shall submit the Desi�n Development documents to the Owner,advise the Owner of any <br /> adjustments to the estimate of the Cost of the Work,and request the Owner's approval. <br /> § 3.4 CONSTRUCTION DOCIlMENTS PHASE SERVICES <br /> § 3.4.1 Based on the Owner's approval oFthe Design Dcvclopment Documents,and on the Owner's authorization of <br /> any adjustmeats in the Project requirements and the budget for the Cost of the Work,the Architect shalt prepare <br /> Construciion Documents for the Owner's epproval.'Il�e Construction Documents shall iUustrate and describe the <br /> further developmcnt of Ehc approved Design Development Documents and shali consist of Drawings end <br /> Specifications setting forth in detail the quality levels of materials and systems and other requirements for the � <br /> construction ofthe Work.The Owner and Architect acknowledge that in orde�to construct the Work the Co�tractoc I <br /> will provide additional information,inc[uding Shop Drawinss,Product Data, Samples and other similar submittals, <br /> which the Architect shaEl review in accordance with Section 3.6.4. <br /> § 3.4.2 The Architect shall incorporate into the Construction Documents the design requirements of governmental <br /> authorities having jurisdiction over the Project. <br /> § 3.4.3 During the development of the Construction Documents,the Architect shall assist the Owaer in the <br /> development and preparation of(1)bidding and procurement informadon that describes the time,plece and <br /> conditions of bidding,including bidding or proposal fortns;(2)the form oFageement between the Owner and <br /> Contractor;and(3)the Conditions ofthe Contract for Conswction(General,Supp[ementery and oiher Conditians). <br /> The Architect shall also compile a project manual that includes the Conditions of the Convact for Canstruction end <br /> Specifications and may include bidding requirements and semple forms. <br /> � (Paragraph deleted) <br /> § 3.4.5 The Architect shall submit the Construction Documents to the Owner,advise the Owner of any adjustments <br /> to the estimate of the Cost of the Work,take any action required under Section 6.5,and request the Owner's <br /> apprnval. <br /> § 3.5 61DDING OR NEGOTIATION PHASE SERVICES <br /> § 3.5.1 GENERAL <br /> The Architeci shall assist the Owna in establishing a list oFprospective contractors.Following the Owner's <br /> apprava!of the Construction Documents,the Architect shall assist the Owner in(1)obtaining competitive bids;(2} <br /> confirming responsiveness of bids;(3)determining the successful bid, if any;and,(4}awarding contracts for <br /> construction. <br /> § 3.5.2 COMPETITNE BIQOING <br /> § 3.5.Z.1 Bidding Documents shall consist of bidding requirements and p�oposed Contract Documents. <br /> § 3.5.22 The Architect shall assist the Owner in bidding the Project by <br /> .1 procuring the reproduction of Bidding Doeuments for distribution to prospective bidders; <br /> .2 distributing the Bidding Documents to prospective bidde�s,requesting their return upon compietion <br /> oFthe bidding process,and maintaining a los ofdistribution and retrieval and ofthe amounts of <br /> deposits, ifany,received from and returned to prospective bidders; <br /> .3 organiung and conducting a pre-bid conference for prospective bidders; <br /> �n� AIA Doeument 8101"'—2007�form�Ay 6161"'—1887).Copyrlphl O 19��,1978,198T,1997 and 2007 Dy The Ame�ican InstlEute d AreMitects.All riyhb <br /> teserv�d.WARNING Thls A!A' Oocumenl ts proteetsd by U.S.Copyright Law and Intemational Treaties,UnautAorh�d rvproductbn or distributbn � <br /> ol this AIA` Document,or any portion of it.may resuH In sevore clvfl and criminal penalUee,and will be prosetutwt to tha mazlmum ertent poeslble <br /> � under the law.Thb dowment wee produead by AU1 soflwaro at 11 27_15 on 06108l20115 vndar Ordar No.656370971�_1 wtlkh��Iros on 07lOtQ016,end Is <br /> not for resale j <br /> UserNobs: (1937336371) % <br /> V <br />