Laserfiche WebLink
.4 preparing responses to questions from prospective bidders and providing clarifications and <br /> interpretations ofthe Bidding Documents to all prospective bidders in the form of addenda;and <br /> .5 organizing and conducting the opening of the bids,and subsequently dacumenting and distributing <br /> the bidding results,as directed by the Owner. <br /> § 3.5.23 The Architect shall consider requests for substitutions,if the Bidding Documents permit substitutions,and <br /> shall prepare and distribute addenda identifying approved substitutions to all prospective bidders. <br /> I (Paragraphs deleted) <br /> § 3.6 CONSTRUCTION PHASE SERVICES <br /> § 3.6.1 GENERAL <br /> § 3.6.1.'1 The Architect shall provide administration of the Contract betwecn the Owner and the Contractor as set <br /> focth below and in AIA Document A201 TM-20{l7,Genoral Conditions of the ConUacl for Canstruction.1 f the O�mer <br /> and Contrector modify A[A Document A201 -2007,those modifications shall not affect the Architect's services <br /> under this Ageement unless ihe Owner and!he Architect amand this Agreement. <br /> § 3.6.1.2 The Architect shall advise und consult with the Owner durin�the Construction Phase Services.'Tl�e <br /> Architect shall have suthority to act on behalf of the Owner only to the exte�t pravided in this AgeemenG The <br /> Architect shall not have control over,charge of,or responsibility for the consiruction means,melhods,techpiques, <br /> sequences or procedures,or for safety precautions and progams in connection with the Work,nor shall the <br /> Architect be responsible for the Contractor's failure to perform the Work in eccordance with the requirements ofthe <br /> Contract Documents.The Architect shall be responsible for the Archi�ect's negligent acu or omissions,but shall not <br /> have control over or charge of,and shall not be responsible for,acts or omissions of the Contractor or of any other <br /> persons or entities performing portions of the Work <br /> § 3.6.1.3 Subject to Section 4.3,chc Architoct's responsi6i{ity to provide Construction Phase Services commences <br /> with the award of the Cond'act for Construction and terminates on the date the Arct�itect issues the final Certificate <br /> for PaymenG <br /> § 3.6.2 EVALUATIONS OF THE WORK <br /> § 3.6.2.1 The Architect sha11 visit the site at intcrvals appropriate to the state of construction,or as otherwise <br /> required in Section 43.3,to become generally familiar with the progress and quality of the portion of the Work <br /> completed,and to determine,in general,if the Work observed is being performed in a manner indicatin�that the <br /> Worl:,when fully completed,will be in accordance with the Contract Documents and the construction schedule. <br /> Mowever,the Architect shall not be required to ma1:e exhaustive or continuous on-site inspections to check the <br /> quality or quantity of tf�e Work.On the basis of the si�e visits,the Architect shall keep the Owner reasonably <br /> informed about the progress and quality of the portion of the Work completed,and report to the Owner(I)observed <br /> deviations from the Contract Documents and&om the most recent construction schedufe submitted by the <br /> ConLactor,and(2)apparent deFects and deficiencies observed in the Work. <br /> § 3.6.22 The Architect has the authority to recommend to the Owner ta reject Wak that daes not conForm to the <br /> Contract Documents.Whenever the Architect considers it necessary or edvisable,the Architect shall have the <br /> nuthority to recommend to the Owner to require inspection or testing of the Work in accordance with the�ovisions <br /> of the Contract Documents,whether or not such Work is fabricated,installed or compieted.However,neither this <br /> authority of the Architect nor a decision made in�ood faith either to exercise or not to exercise such au�aity shall <br /> give rise to a daty or responsibility of the Architect to the Contractor,Subcontractors,material end equipment <br /> supplias,their age�ts or employees or other persons or entities performing portions oFthe Work. <br /> § 3.6.2.3 The Architect shall interpret and decide matters concerning performance of the Owner and Contractor <br /> under,and requirements of,the Contract Documents on written request of either the Owner or Cantractor.The <br /> Architect's response to such requests shall be made in writing within any time limits ag�eed upon or oiherwise with <br /> r�anab[e promptness. <br /> § 3.6.24 Interpretations and decisions oFthe Architect shall be consistent with the intrnt of end reasonably inferable <br /> from the Contract Documents and shafl be in writing or in the form ofdrawings.When making such interpretations <br /> aod decisions,che Architect shall endeavor to secure faithful performance by both Owner and Contractor,shall not <br /> show paniality to either,and shall not be liable for results of interpretations or decisions rendered in good faith.The <br /> AIA Doeument 8101 TM—2007(formMy B1NTM—1997}.Copyripht O 1974.1978.1SB7.1997 and T007 by The Amerlcan Instllute of Arehdeets.All�iyhb <br /> �n�' re�anad.W�NING:Thfa AIA'� Document Ia protected by U.S Gopyrtght Law and Infarnatlonal Treades.Unauthorized reproducdon or distrlhutlon s <br /> of thls AIA• Documant,or any poAlon ol k,may reault In savere clvil and criminal penalttee,and wfll be prosecuted to the mazlmum extent posslble <br /> � u nder the law.This doeument was produeed by AU1 sortware at 11 27.15 on 06I0812018 under Order No 8583709714 1 wh�ch e�lres on 07/012018.and'es <br /> rwtfa reaale. <br /> UserNobs: (1537336371) / <br /> ,1/ <br />