My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-76 AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGMENT (Dewberry Architects)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 10:28:36 AM
Creation date
6/29/2016 8:16:16 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2016-76
Res Ord Title
AUTHORIZING CITY MANAGER TO ENTER INTO A CONSTRUCTION PROJECT MANAGEMENT WITH DEWBERRY ARCHITECTS, INC. FOR THE FIRE FACILITY REHABILITATION INITIATIVE
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architect's dccisions on mattcrs relatins to aesthetic effect shall be final if consistcnt with the intent expressed in the <br /> Contract Documents. <br /> § 3.6.2.5 Unitss the Owner and Contracior designate another person to serve as an lnitial Decision Maker,as that <br /> ttrm is defined in AIA Document A201-2007,the Architect shall rrnder initial decisions on Claims between the <br /> Owner and Contraaor as provided in the Contract Documrnts. <br /> § 3.6.3 CERT1FiCATES FOR PAYMENT TO CONTRACTOR <br /> § 3.6.3.1 The Architect shall review and certify the smounts due the Co�tractor and shall issue certificates in such <br /> amounts.7'he Architect's certification for payment shail constitute a rep�esentation to the Owner,based on the <br /> Architect's evaluation of the Work as provided in Seciion 3.6.2 and on the data comprising the Contractor's <br /> Application for Payment,that,to the best oFthe Architect's I�owled�e, information and belief,the Work has <br /> progessed to the point indicated and that the quality of the Work is in accordance with the Contract Documents. <br /> 71ee foresoing representations are subject(1)to an evaluation of the Work for conformance with the Contract <br /> Documents upon Substantial Completion,(2)to results of subsequent tessts end inspections,{3)to correction of <br /> minor deviations from tf�e Contract Documents prior to completion,and{4)to specific qualiflcations expressed by <br /> the Architect. <br /> § 3.6.3.2 The issuance of a Certificate for Aayment shal!not be s representation that the ArchitecE bas(1)made <br /> exhaustive or continuous on-site inspections to check the quality or quantity of the Work,(2)reviewed construction <br /> means,methods,techniques,sequences or procedures�{3)reviewed copies of requisitions received from <br /> Subconvactors and material suppliers and other data requ�sted by the Owner to substantiate tE�e Contractor's right to <br /> payment,or(4)ascertained haw or for what purpose the Contractor has used money previously paid on account oF <br /> the Contract Sum. <br /> § 3.6.3.3 The Architect shell maintein a record of the Applications and Certificates for Payment. <br /> § 3.6.4 SUBMiTTALS <br /> § 3.6.4.17'he Architect shall review the Contractor's submittal schedule and shall not unressonably delay or <br /> withhold approval.The Architect's action in reviewing submittals shall be taken in accordancc with the approved <br /> submittal schedule a,in the absence of an approved submittal schedule,with reasonable promptness while allowins <br /> sufficient time in the Architect's professional judgment to permit adequate review. <br /> § 3.6.4.2 In accordance with the Architect-approved submittal scheduEe,the Architect shall review and approve or <br /> take other eppropriate action upon the Contractor's submittals such as Shop Drawings,Product Data and Samples, <br /> but only for the limited purpose of checking for conformance with information given and the design concept <br /> expressed in the Contract Documents.Review of such submittals is not for the purpose of determining the accuracy <br /> and completeness oFother informatioa�such as dimensions.quantities,and installation or performence of equipment <br /> or systems,which are the Contractor's responsibility.'The Architect's review shall not constitute approval of safety <br /> precautions or,unless otherwise specifically stated by the Architect,of any constructioa means,methods, <br /> techniques,sequenc�s or procedures.77ie Architoct's approval of a speci6c item shall not'indicate approval of an <br /> assembly oFwhich the item is a componen� <br /> § 3.6.4.31f the ContraM Documents specifically require the Contractor to provide professional design services or <br /> certifications by a design professional related to systems,materials w equipment,the Architect shall specify the <br /> eppropriate performance and design criteria that such services must satisfy.The Architect shall review shop <br /> drawings and other submittals related to the Work designed or certified by the design professioaal retained by the <br /> Contractor that bear such professional's seal and signature when submitted to the Architect.The Architect shall be <br /> entitled to rely upon the adequacy,accuracy and completeness of the services,certi6cations and approvals <br /> performed o�provided by such dtsign professionals. <br /> § 3.6.4.4 Subject to the provisions of Section 4.3,the Architxt shall review and respor�d to requests for information <br /> about the Convact Documents.'The Architect shall set forth in the Contract Documents the requirements for requests <br /> for information.Requests for information shall include.at a minimum,a detailed wririen statement that indicates the <br /> specific Drawings or Specifications in need of clari6cation and the nature of the clarification requested.The <br /> Architect's response to such requests shall be made in writins within any time limits agreed upan,or otherwise with <br /> (n� AIA Ooeum�rt 9101 TM—2007�Tortn�rly B7b1"'—1897�.Copyrlpht O 19T�,1978,1987,1997 and 2007 6y The Amerkan Instltule d Arc.hltecta.All riQhls <br /> rss�rvfd.WARNING:Thls A!A• Doeumant fs protacted 6y U.S.Copyrlght Lew and Intemadonal TraaUea.Unauthorfzed reproducUon or dlstrlbut{on 7 , <br /> of thla AIA° Doeument,or any poAlon of N,may resuN lo aevere civN and crlmine)penakke,and will be prasacuted to the maxfmum a:tent posslble I <br /> � under the law Thb documant wu produeed by AW wRware at 11,27 15 on 08/0&20t8 under O�der No.6563709714_1 whlrh��f�s on 0710if1018.and Is <br /> not(or rnssle. / <br /> Us�r Nof��: (1�37�]8371} v <br />
The URL can be used to link to this page
Your browser does not support the video tag.