My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 8:47:40 AM
Creation date
6/29/2016 8:46:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-79
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH KINNEY CONTRACTORS, INC., FOR 2016 STORM DRAINAGE IMPROVEMENTS PROJECT, CITY PROJECT 2016-30
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' I <br /> GENERAL CONDITIONS � <br /> � GG2 CLEAN UP II <br /> The Contractor shall at all times keep the premises free from accumulations of surplus I <br /> � excavated material, waste material or rubbish caused by their employees or work. j <br /> Upon completion of the work, the Contractor shall remove all their rubbish from and about ' <br /> � the structures, buildings, and premises, also all their tools, equipment, scaffolding and surplus 'I <br /> materials, and shall leave their work clean, ready for use. In case of dispute, the Owner may j <br /> remove the rubbish and surplus materials and charge cost of removals to the Contractor or separate ', <br /> �, contractors, if any, in proportion to amounts determined by the Engineer to be just. I� <br /> � GC-3 CONSTRUCTION STAKING 'I <br /> The Engineer shall provide basic line and grade stakmg for construction. Such basic line <br /> � and grade shall be limited in general to: � <br /> (1) not more than two base lines (generally perpendicular to each other) and one bench <br /> � mark for a building, a plant site or a major structure; and <br /> (2) centerline stakes and offset grade stakes, where applicable, at all changes in direction, <br /> � manhole location, special structure, or similar critical location, together with bench <br /> marks, as may be necessary, along the line of work for utility distribution and <br /> transmission lines. <br /> ,' Any additional (detailed) construction staking shall be provided by the Contractor, who <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> Engineer. Detailed construction staking shall generally include such items as slope stakes, <br /> � intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> � grades, and similar control data required to execute the work under this contract. <br /> The Contractor shall furnish all marking paint, stakes, hubs, lath or similar materials <br /> � necessary far additional (detailed) construction staking, and shall provide manual assistance <br /> (rodmen) to assist the Engineer in checking or confirming the detailed staking, to whatever extent <br /> the Engineer deems necessary. Such checking, or the absence of it, by the Engineer shall in no <br /> � way relieve the Contractor from full responsibility for the accuracy and adequacy of the detailed <br /> construction staking. <br /> All costs of materials and labor occasioned by the Contractor's responsibilities as listed <br /> above, shall be borne by the Contractor and shall be included in the respective bid prices of the <br /> various items work. <br /> � <br /> � <br /> I <br /> ' 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.