My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-79 ACCEPTING BID AND AUTHORIZING CONTRACT KINNEY CONTRACTORS (Storm Drainage Improvements)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 8:47:40 AM
Creation date
6/29/2016 8:46:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-79
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT WITH KINNEY CONTRACTORS, INC., FOR 2016 STORM DRAINAGE IMPROVEMENTS PROJECT, CITY PROJECT 2016-30
Approved Date
6/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS ' <br /> GC-4 CONTRACT WARRANTY � <br /> The Contractor shall guarantee all materials and equipment furnished and work performed � <br /> for a period of one (1) year from the date of substantial completion. The Contractor warrants and <br /> guarantees for a period of one (1) year from the date of substantial completion of the system that <br /> the completed system is free from all defects due to faulty materials or workmanship and the � <br /> Contractor shall promptly make such corrections as may be necessary by reason of such defects, <br /> including the repairs of any damage to other parts of the system resulting from such defects. The <br /> Owner will give notice of observed defects with reasonable promptness. In the event that the � <br /> Contractor should fail to make such repairs, adjustments or other work that may be made <br /> necessary by such defects, the Owner may do so and charge the Contractor the cost thereby <br /> incurred. The Contract Bond shall remain in full force and effect through the guarantee period. � <br /> GC-5 CONTRACTOR AVAILABILITY <br /> At all times when work is being performed (by Contractor himself or subcontractor}, the � <br /> prime Contractor shall have on the job site someone in their direct employ who is capable of <br /> meeting with the Engineer and making decisions. If authorized by the Engineer, this condition � <br /> may be satisfied by having a telephone number or someone who satisfies the above requirements. <br /> GC-6 COORDINATION � <br /> Cooperation between the Contractor, City and Property Owners is imperative. The <br /> responsibility and cost to maintain access is borne by the Contractor. The costs for temporary � <br /> walks and driveways if necessary are to be incidental to the related bid items unless specifically <br /> paid as a separate item. <br /> GC-7 DUST CONTROL � <br /> As a part of their construction obligation, the Contractor shall make every reasonable effort � <br /> to control dust throughout the construction area. Dirt, sand or other materials scattered over <br /> traveled areas shall be disposed of by sweeping, flushing or other appropriate measure. <br /> Temporary surfacing shall be continually maintained to avoid loose materials or dust pockets. � <br /> GC-8 ESTIMATED QUANTITIES AND LOCATION CHANGES <br /> The quantities for this job are estimates only. These estimated quantities are used for � <br /> establishing unit prices. The City reserves the right to increase, decrease, or omit any of the <br /> estimated quantities in this project. No additional compensation will be allowed for these � <br /> changes. <br /> � <br /> � <br /> � <br /> 31 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.