Laserfiche WebLink
� <br /> � <br /> � <br /> Project............................DeWitt Emergency Well Field Impmvements Engineer's Estimate Pontious Brothers Mid-States General and SpringSeld Mechanical � <br /> City Project...................9520 Excavating Mechanical Contracting Corp. <br /> Guillou&Associates,Inc. 1752 N.State Highway 105 Corp. 900 S.Wirt Ave. <br /> 124 Maple Grove Lane P.O.Box 77 RR#1,Box 149 Springfield,IL 62703 <br /> Bid Date........................February 6,1996 Springfield,IL 62707 Monticello,IL 61856 Decatur,IL 62526 � <br /> Ph:217/525-8885 <br /> Time..............................10:00 a.m. Ph: 217/529-5549 Ph: 217/762-7042 <br /> Fax:217/529-7562 <br /> PAY ITEM UNTf QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> DMSION 3-HEADWALL MODIIrICATIONS <br /> ANCHORS BOLTS AND REINFORCING Ls i.00 $620.00 $620.00 $500.00 500.00 2000.00 2,000.00 1650.00 1,650.00 I <br /> CONCRETE SI cY i.so $280.00 $420.00 $250.00 375.00 3000.00 4,500.00 1320.00 1,980.00 <br /> EARTHEMBANKIvfENT cY 220.00 $5.40 $1,188.00 $10.00 2,200.00 9.00 1,980.00 17.00 3,740.00 <br /> Gxa,VITY Dx atrr AT Nra,rrxOLE B LS l.00 $405.00 $405.00 �600.00 600.00 1000.00 1,000.00 1 OSO.00 1,050.00 <br /> WA�rsRWAY Gx�irrG CY aoo.00 $2.53 $1,012.00 $8.50 3,400.00 5.00 2,000.00 8.00 3,200.00 <br /> xxax�� Tox zo.00 $50.75 �1,015.00 $80.00 1,600.00 100.00 2,000.00 135.00 2,700.00 <br /> SEED BED LIIvfE FERTII,IZE SEED AND M[JLCH ACRE 0.86 $34.56 �29.72 $1,800.00 1,548.00 2500.00 2,150.00 3100.00 2,666.00 <br /> DMSION 4-ACCESS LANES <br /> ROUGHGRnDING-ExISTING3"STONE SF laaoo.00 $0.07 �1,008.00 $0.20 2,8HO.O0 0.20 2,880.00 0.75 10,800.00 <br /> EARTH FILI.LJNSLTITABLE MA1'ERIAL cY no.00 $3.20 $2,400.00 $4.70 3,525.00 3.00 2,250.00 5.00 3,750.00 I <br /> as-trrC T�E A Ma�rrxOLE 6 F'r � l.00 $835.00 $835.00 $1,150.00 1,150.00 500.00 500.00 2000.00 2,000.00 II <br /> STOOL TYPE DITCH GRA'fE �a t.00 $193.00 �193.00 �325.00 325.00 300.00 300.00 500.00 500.00 I <br /> HDPE PIPE 15-IN ASHTo M24a-s LF 16s.00 $11.13 $1,869.84 $23.50 3,948.00 50.00 8,400.00 73.00 12,264.00 <br /> END SECTION 15-IN IDOT 2228-5 EA 1.00 $152.00 $152.00 $32$.00 325.00 80.00 80.00 1050.00 1,050.00 <br /> CA-6 COARSE AGGREGAI'E TON 485.00 $12.60 $6,111.00 $18.50 8,972.50 22.00 10,670.00 29.00 14,065.00 <br /> SEED BED LIME FERTII,IZE SEED AND MULCH SY 690.00 $0.80 �552.00 $0.80 552.00 1.00 690.00 1.25 862.50 <br /> DIVISION 5-FUEL TANKS AND CONTAINMEIVT STRUCTURES <br /> STEEL FCJEL TANKS,560 GAL,INSTALL WITH I <br /> SUPPORTS Ea s.00 $550.00 �4,400.00 $448.00 3,584.00 1200.00 9,600.00 1650.00 13,200.00 <br /> EARTHEXCAVATION CY 42.00 $10.00 $420.00 $12.00 504.00 30.00 1,260.00 55.00 2,310.00 <br /> GRAN[n.wRFII.L TON 70.00 $10.75 $752.50 $14.50 1,015.00 20.00 1,400.00 29.00 2,030.00 I� <br /> REINFORCEDCONCREI'E SI cY is.00 $600.00 $1q800.00 $250.00 4,500.00 1030.00 18,540.00 1320.00 23,760.00 �I <br /> REINFORCED STEEL-#6 Ls sao.00 �1.00 $340.00 $2.00 680.00 1.00 340.00 1.25 425.00 <br /> REINFORCED STEEL-#8 LB 350.00 $1.00 $350.00 $2.00 700.00 1.00 350.00 1.25 437.50 <br /> wEt.D�n wutE MESH-6"x6"-#loxal0 LB 70.00 $2.07 $144.90 $2.00 140.00 1.50 105.00 4.00 280.00 ' <br /> FUEL TaNx FrTTcrrGS arm P�ttaG EA 8.00 $375.00 $3,000.00 $32.00 256.(� 20.00 160.00 1650.00 13,200.00 <br /> DIVISION 6-PIPE ANCHORS AND SUPPORTS <br /> PIPEANCHORS EA s.00 $310.00 $1,550.00 $100.00 500.00 100.00 500.00 28.00 140.00 ��, <br /> P�E SUPPORTS EA 23.00 $87.00 $2,001.00 $100.00 2,300.00 200.00 4,600.00 110.00 2,530.00 I <br /> TOTAL BID AS CORRECTED $201,167.79 172,967.00 302,631.00 434,110.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 14.02 50.44 115.79 <br />