be sized to drain portions of the City within a reasonable distance of the new roadway. Timeline: <br /> Construction on Baltimore Road is scheduled to begin in 2017. <br /> 2. Nelson Park Neighborhood Storm Draina�e: This project addresses the area ranked as the 2"d <br /> highest priority in the 2009 Master Plan. The project will separate storm drainage from the <br /> sanitary sewer system serving the neighborhood along with other storm drainage improvements. <br /> These improvements are planned to be funded through a low interest loan administered by the <br /> Illinois Environmental Protection Agency. Timeline: Construction is scheduled to begin spring <br /> of 2017. <br /> 3. Meadowlark Subdivision: This project targets the neighborhood's ongoing storm drainage <br /> problems which were ranked as the 1 St priority in the 2009 Master Plan. Drainage problems in <br /> Meadowlark include flooding in the major storm drainage ditch coursing through the <br /> neighborhood, storm sewer surcharging during heavy rains, and general street flooding. <br /> Timeline: These improvements are scheduled to begin in late 2017. <br /> BACKGROUND: <br /> On February 26, 2016, the Public Works Department issued a request for proposals and qualifications <br /> from area engineering firms. Nine firms responded to the City's request and 5 firms submitted <br /> formal proposals and statements of qualifications. Public Works Department staff reviewed the <br /> proposals and recommends Farnsworth Group as the firm best able to serve the City in preparing a <br /> preliminary engineering design of the storm drainage in the 32°d and Fulton area of the City and <br /> providing recommendations for future actions. Farnsworth is an engineering firm located in Central <br /> Illinois and has a branch office in the City. They have completed several design projects for the City. <br /> The 32°d/Fulton Drainage Improvement Project will be completed in 3 phases: <br /> 1. Preliminary Drainage Design: This phase will review the area storm drainage system, or lack <br /> thereof, and will prepare an action plan for the City consisting of future drainage projects to <br /> be designed and constructed to address identified problems. The main product for this phase <br /> will be the preparation of a Preliminary Design Report that will identify the specific drainage <br /> concerns, prioritize them, recommend solutions, and estimate probable costs. Preliminary <br /> results should be completed in time to incorporate recommendations into the City's 2017 <br /> Capital Improvement Plan and the final report should be completed by February, 2017. <br /> 2. Final Design(s): Using the Project Design Report referenced above, City staff will be able to <br /> clearly outline the scope of services to plan for the design and construction of future drainage <br /> projects. It is anticipated that the majority of these projects will be a few years in the future, <br /> depending on their size and complexity. The 2009 Storm Drainage Master Plan suggested <br /> that possible design and construction costs to address storm drainage in this area could exceed <br /> $10 million. Therefore, it is likely that projects in this area will be scheduled in future years <br /> such that they can be accomplished within the expected revenues of the system or that a low <br /> interest loan be sought to finance the work. <br /> 3. Construction Phase(s): This phase will consist of constructing identified improvements. <br /> Depending on the area needs and projected costs, this phase could be broken into multiple <br /> projects to better schedule the work and meet the funding ability of the City. Construction is <br /> not currently shown in the City Capital Improvement Plan. The current project will enable <br /> future design and construction projects to be planned in the Capital Improvement Plan. <br /> � 2 � <br />