My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-148 AUTHORIZING AGREEMENT - IDOT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-148 AUTHORIZING AGREEMENT - IDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 1:32:31 PM
Creation date
7/8/2016 1:32:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-148
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS DEPARTMENT OF TRANSPORTATION TRAFFIC SIGNAL IMPROVEMENTS
Approved Date
10/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�► � � � 5 - � �f � � <br /> Illinois Department of Transportation <br /> Division of Highways/District 5 <br /> Rt. 133 West/P.O. Box 610/Paris, Illinois 61944-0610 <br /> Telephone (217) 465-4181 <br /> September 29, 1995 <br /> PROGRAM DEVELOPMENT <br /> Letter of Understanding <br /> F.A.P. Route 710 & 710 Alt. (U.S. 51) <br /> Section (48Z-3)TS, TS-1, TS-2 & (48Z)TS <br /> Macon County <br /> Contract No. 90649 <br /> C-95-037-94 <br /> Agreement No. LU-596001 <br /> The Honorable Terry M. Howley <br /> Mayor, City of Decatur <br /> One Gary K. Anderson Plaza <br /> Decatur, Illinois 62523 <br /> Dear Mayor Howley: <br /> The State of Illinois, acting through its Department of Transportation, is proposing to <br /> modernize the existing traffic signals at the intersections of Franklin Street (F.A.S. <br /> Route 710 Alt.) and Main Street (F.A.P. Route 710) with William Street, Prairie <br /> Street, West Main Street, and Decatur Street, all of which are within the corporate <br /> limits of the City of Decatur. <br /> The work included in this contract consists primarily of the installation of detector <br /> loops, new controllers, controller cabinets, signal heads, mast arms, and posts. The <br /> intent is to improve and upgrade existing facilities to reduce delay and enhance safety. <br /> It is the intention of the Department that all streets be kept open to traffic during <br /> construction of this project. One or two traffic lanes will remain open in the immediate <br /> work areas and shall be regulated with appropriate traffic control standards, with the <br /> use of flagman when necessary. <br /> Financial participation by the City is not anticipated, unless the City requests additional <br /> work which is outside the scope of the project. All other costs incurred in the <br /> completion of this traffic signals modernization project, in accordance with the plans <br /> and specifications, will be borne by the Department. This project is being funded <br /> under a special Green Light Program by the State of Illinois. The estimated cost of this <br /> project is $120,000. Without this program, the City's financial participation in this <br /> project would have been equal to $57,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.