Laserfiche WebLink
CITY OF DECATUR, ILLINOIS <br /> RIGHT-OF-WAY SURVEYING SERVICE AGREEMENT ' <br /> FOR 13 ACRES PROJECT <br /> THIS AGREEMENT, made and entered into the 22nd day of August, A.D., 1995, by and <br /> between the CITY OF DECATUR, ILLINOIS, hereinafter referred to as the "CITY" and <br /> PHILLIP W. COCHRAN - CONSLTLTING ENGINEER, hereinafter referred to as the <br /> "ENGINEER", covers professional surveying services in connection with the preparation of <br /> surveys, right-of-way plans, and right-of-way plats for the "13 ACRES" PROJECT. <br /> WITNESSETH THAT, in consideration of these premises and of the mutual covenants <br /> herein set forth, <br /> THE ENGINEER AGREES, <br /> 1. Boundary Surve,y and Related Items: <br /> a. To perform a boundary survey of the entire project site. The <br /> site boundary as defined in the exhibit attached to the City's <br /> Request or proposal and as further defined in items II A (2, <br /> 3, 4, 5, & 7). <br /> b. To perform the research required to: <br /> 1. Identify the Owners of all parcels within the boundary <br /> 2. Identify and show all easements of record <br /> 2. Additional Topographv Survey Within and Adjacent to the Project Limits: <br /> a. Tie down all buildings within the project limits, including a11 <br /> improvements adjacent to the proposed alignments (curbs, <br /> driveways, storm detention facilities, etc.). <br /> b. Locate Hickory Point Frontage Road (HPFR) and the <br /> Budgetel private drive. Location to be tied to Boundary <br /> Survey and shall include the back of curb or edge of <br /> pavement locations. <br /> 3. To provide all survey information and results on a disc formatted using AutoCad <br /> Release 12. <br /> 4. Provide field monumentation of all final right-of-way acquisitions as well. as <br /> identify a11 locations of the same points in a temporary manner during right-of-way <br /> negotiations. <br />