Laserfiche WebLink
5. Ri�ht-of-way Document�reparation: <br /> a. Prepare a Right-of-Way Strip Map identifying all parcel <br /> owners, addresses and parcel Tax I.D. Numbers. <br /> b. Prepare all Right-of-Way Plats for all proposed takings after <br /> the City of Decatur has prepared final alignments of <br /> roadways. <br /> c. Prepare the legal descriptions for all parcels for the use by <br /> the City in preparing the Right-of-Way Documents and <br /> deeds. <br /> d. All work shall be done in accordance with the requirements <br /> of the State of Illinois and as per the recognized <br /> professional standards. <br /> e. All work will be done at the direction of a Registered <br /> Professional Land Surveyor. <br /> 6. To complete a11 items of work outlined in Sections 1-3 above within two weeks of <br /> the Notice to Proceed. <br /> 7. To complete a11 items of work outlined in Section 5 within two weeks of the <br /> receipt of the City of Decatur's Street alignment. <br /> 8. To complete all items of work outlined in Section 4 within 3 weeks of notification <br /> by the City of Decatur to do so. <br /> 9. That all plans, plats, and descriptions to be furnished by the ENGINEER shall be in <br /> accordance with the current standard specifications and polices of the CITY, it <br /> being understood that all such plans, plats, descriptions, and drafts shall, before <br /> being finally accepted, be subject to approval by the CITY. During the <br /> performance of the surveying services herein provided for, the ENGINEER shall <br /> be responsible for any loss or damage to the documents herein enumerated while <br /> they are in the ENGINEER'S possession and any such loss or damage shall be <br /> restored at the ENGINEER'S expense. <br /> 10. To attend conferences to be held at the request of the CITY and visit the site of <br /> the work at any reasonable time when requested to do so by the CITY. <br />