Laserfiche WebLink
� , ENCLOSURE (1) <br /> • FAI-72 & US-51 <br /> • CITY OF DECATUR <br /> BWC #95-41 (1) <br /> July 25, 1995 <br /> Page 3 of 9 <br /> Rev. Aug. 31 , 1995 <br /> PROJECT REQUIREMENTS <br /> C. PROJECT PLAN: (Continued) <br /> 2. PRODUCT - SURVEYS FOR ROADWAY <br /> ACTIVITIES: <br /> 2.01 Locate existing horizontal and vertical controls. <br /> 2.02 Measure and verify existing horizontal control positions. <br /> 2.03 Locate available property pins. <br /> 2.04 Cross Section existing exit ramp and Route 51 to Barnett <br /> Avenue: <br /> a. Ramp left edge to Koester Drive and westbound <br /> entrance ramp loop. <br /> b. Route 51 right edge to Koester Drive. <br /> c. Profile Route 51 right edge back 500' from ramp gore <br /> of US-51 . <br /> 2.05 Set baseline on Hickory Point Road 700' <br /> 2.06 Run cross sections 500' Hickory Point Road. <br /> 2.07 Pick up cross road culverts. <br /> 2.08 Reduce notes. <br /> 2.09 Miscellaneous survey during plan development. <br /> 3. PRODUCT - LOCATION DRAWINGS <br /> ACTIVITIES: <br /> 3.01 Establish limits of plan and profile sheets. <br /> 3.02 Prepare plan and profile sheets of existing topo. <br /> 3.03 Pre are cross section sheets. <br /> P <br /> 3.04 Prepare existing and proposed typical sections. <br />