Laserfiche WebLink
� , ENCLOSURE (1) <br /> • FAI-72 & US-51 <br /> • CITY OF DECATUR <br /> BWC #95-41(1) <br /> July 25, 1995 <br /> Page 4 of 9 <br /> Rev. Aug. 31 , 1995 <br /> PROJECT REQUIREMENTS <br /> C. PROJECT PLAN: (Continued) <br /> 4. PRODUCT - DRAINAGE ANALYSIS <br /> ACTIVITIES: <br /> 4.01 Establish existing drainage patterns on aerial mapping <br /> and compute runoff. <br /> 4.02 Review drainage patterns for proposed condition to insure <br /> drainage will work and analyze existing culverts. <br /> 5. PRODUCT - INTERCHANGE DESIGN STUDY: I-72 RAMP <br /> ACTIVITIES: <br /> 5.01 Acquire existing and projected traffic counts. <br /> 5.02 Plot site plan for area of cloverleaf interchange. <br /> 5.03 Establish alignment for westbound exit ramp. <br /> 5.04 Acquire approval for ramp alignment. <br /> 5.05 Determine ramp taper geometry adjacent to <br /> FAI-72 and existing I.T.R.R. Railroad Bridge. <br /> 5.06 Determine effects of ramp relocation on existing <br /> abandoned I.C.R.R. Bridge structure over FAI-72. <br /> 5.07 Prepare Interchange Design Study (IDS) drawings (General <br /> Plan and Ramp Plan and Profile). <br /> 5.08 Submit to City of Decatur and District for review. <br /> 5.09 Compile review comments and revise, as required. <br /> 5.10 Submit for final review and approval . <br />