Laserfiche WebLink
� , ENCLOSURE (1) <br /> � � BWC #009-9502 <br /> June 23, 1995 <br /> Page 1 of 4 <br /> PROJECT REQUIREMENTS <br /> A. PROJECT DESCRIPTION: <br /> Preparation of a final report on the impact assessment and resource <br /> management plan for the potential construction of two low flow rock dams on <br /> the Sangamon River at Rea's Bridge Road. <br /> B. DISTRIBUTION OF RESPONSIBILITIES AMONG PROJECT PARTICIPANTS: <br /> 1 . ENGINEERING SERVICES BY BLANK. WESSELINK. COQK & ASSOCIATES/HARZA <br /> ENGINEERING COMPANY (BWC/HEC) TEAM: <br /> a. Civil Engineering Services. <br /> b. Environmental Engineering Services. <br /> c. Technician/Drafting Services. <br /> d. Administrative/Clerical Services. <br /> 2. SERVICES BY CITY OF DECATUR: <br /> a. Designate representative for contact. <br /> b. Make available all existing documents„ drawings, and data <br /> pertinent to this project. <br /> 3. SERVICES NOT INCLUDED: <br /> a. Procurement of permits. <br /> b. Preparation of designs, plans, or specifications. <br /> c. Analysis of Lake Decatur or the Sangamon River beyond the limits <br /> of this proposal . <br />