Laserfiche WebLink
Project............................Milling and Rehabilitation ENGINEER'S ESTIMATE DUNN COMPANY ILLINOIS VALLEY PAViNG <br /> City Project...................9508 724 N. Mercer St. P.O. Box 648 ,, <br /> Decatur, IL 62522-1699 Decatur, IL 62525 <br /> Bid Date........................July10, 1995 t <br /> Time...............................10:15 A.M. <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE <br /> Cotd Milling S.Y. 70,000.00 1.65 115,500.00 1.65 115,500.00 1.63 114,100.00 <br /> Valve Box to be Replaced Each 3.00 $355.00 $1,065.00 345.00 1,035.00 350.00 1,050.00 <br /> Manhole Frame 8 Lid, Type I, CL Each 3.00 $575.00 $1,725.00 565.00 1,695.00 550.00 1,650.00 <br /> Bituminous Materials AC 85-100 (Prime Coat) Gals 24,500.00 $1.25 $30,625.00 1.25 30,625.00 1.30 31,850.00 <br /> Aggregate (Prime Coat) Tons 140.00 $12.50 $1,750.00 12.75 1,785.00 13.00 1,820.00 <br /> Bituminous Concrete Surface Course, Class I Tons 7,000.00 $41.00 $287,000.00 41.50 290,500.00 41.65 291,550.00 <br /> Area Reflective Crack Control S.Y. 70,000.00 $0.95 $66,500.00 0.95 66,500.00 1.00 70,000.00 <br /> Mixture for Cracks, Joints and Flangeways Tons 30.00 $150.00 a4,500.00 150.00 4,500.00 150.00 4,500.00 <br /> Valve Box Milling Each 40.00 $140.00 $5,600.00 135.00 5,400.00 130.00 5,200.00 <br /> Manhole/Catch Basin Milling Each 50.00 $150.00 $7,500.00 145.00 7,250.00 140.00 7,000.00 <br /> Valve Box Adjusted Each 6.00 $105.00 $630.00 100.00 600.00 100.00 600.00 <br /> TOTAL BID AS CORRECTED $522 395.00 525 390.00 529 320.00 <br /> Percent Over or Under ENGINEER'S ESTIM E 0.57 1.33 <br />