My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-92 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-92 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 3:59:17 PM
Creation date
7/8/2016 3:59:16 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-92
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT DECATUR PUBLIC LIBRARY ROOF REPLACEMENT
Approved Date
7/17/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 9 <br /> ENUMERATION OF CONTRACT DOCUMENTS <br /> 9.1 The Contract Documents, except for Modifications issued aher esecution of this Agreement, are enumerated as follows: <br /> 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor,AIA Document A101, 1987 <br /> Edition. <br /> 9.1.2 The General Conditions are the General Conditions of the Contract for Construction,AIA Document A201, 1987 Edition. <br /> 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated <br /> June 1995 , and are as follows: <br /> Document Title Pages <br /> 00020 Invitation to Bid 00020-1-2 <br /> 00100 Instructions to Bidders 00100-1-7 <br /> 00310 Bid Form 00310-1-3 <br /> 00410 Bid Bond (AIA Form A310) 00410-1-1 <br /> 00600 Performance Bond, Labor and Material <br /> Payment Bond (AIA Form A312) 00600-1-6 � <br /> 00700 General Conditions (AIA Form A201) 00700-1-24 �' <br /> 00800 Supplementary Conditions 00800-1-8 <br /> 00850 List of Drawings 00850-1-1 <br /> 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: <br /> (Eitl�er[is!the Specrfrcutions bere or reJer to cur eshibit uttuci�ect to thu.igreement./ <br /> Section Tide Pages <br /> ' GENERAL REQUIREMENTS <br /> 01010 Project Summary 01010-1-2 <br /> 01030 Alternate Bids 01030-1-1 <br /> 01300 Submittals 01300-1-11 <br /> 01600 Material and Equipment 01600-1-3 <br /> SITE WORK <br /> 02072 Minor Demolition for Re-Roofing 02072-1-3 <br /> WOOD & PLASTIC <br /> 06100 Rough Carpentry 06100-1-3 <br /> THERMAL & MOISTURE PROTECTION <br /> 07530 Elastomeric Membrance Roofing (EPDM) 07530-1-7 <br /> 07600 Flashing and Sheet Metal 07600-1-4 <br /> AIA DOCUMENT A101 • OWNER-CONTRaCTOR AGREEMENT • T�G'ELFTH EDITION• AIA° • OO l98' <br /> THE AMERICAN INSTITCTE OF ARCHITECTti, l?35 NEW'YORK AVFNL'E.V�Y'.,VG:45HINGTON,D C.300(K A�O�-�9S7 G <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.