My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R95-92 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1995
>
R95-92 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 3:59:17 PM
Creation date
7/8/2016 3:59:16 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R95-92
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT DECATUR PUBLIC LIBRARY ROOF REPLACEMENT
Approved Date
7/17/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br /> FINAL PAYMENT <br /> Final payment,constituting�he entire unpaid batance of the Contract Sum,shall be made by the Owner to the Contractor when(1) <br /> the Contract has been fully performed by the Contracror escept for the Contractor's responsibIlity to correct nonconforming <br /> Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily <br /> survive final payment;and(2)a final Certificate for Payment has been issued by the Architect;such final payment shall be made by <br /> the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: <br /> ARTICLE 7 <br /> MISCELLANEOUS PROVISIONS <br /> 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document,the ref- <br /> erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br /> 7.2 Payments due and unpaid under the Contract shall bear interesc from the date payment is due at the rate stated below,or in <br /> the absence thereof, at the legal rate prevailing from time co time at the place where the Project is located. <br /> (Insert rate oj interest agreed upon, iJ any.� <br /> (L'sury laws and requirements+�nder the Federal Truth in Lending Act,similar state and loca(co�rsumer credrt[au�s and other regulations at tbe Owner's and <br /> Contractor's principal places oJ business,the locatiore of the Project and elseu�bere may ajject the ralidity of this prot�ision.Lega!udcnce sbould be obtained <br /> with respect to deletioris or modijicattons, and ulso regarding requirements sucb as wr:tten disdosures or wainers.) <br /> 7.3 Other provisions: <br /> N/A <br /> ARTICLE 8 <br /> TERMINATION OR SUSPENSION <br /> 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. <br /> 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREE�IENT • TWELFTH ED[TION• AIA° • C1987 <br /> THE AMER(CAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENL'E,N.W'.,WASHINGTON,D.C.?OOOC A�0�-1987 S <br /> WARNING:Unlicensed photocopying vfolates U.S.copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.