Laserfiche WebLink
�Of DEC�s DECATUR, ILLINOIS <br /> v C <br /> � /t"NO`Y Lake Shore Drive Reiocation Stu.dy <br /> COStS <br /> Preliminary construction costs were developed for each alternative. Right-of-way costs were not <br /> included. <br /> • Alternative A - No cost <br /> • Alternative B - No cost <br /> • Alternative C - $6.1 million <br /> • Alternative D - $2.3 million <br /> • Altemative E - $2.2 million <br /> • Alternative F - $3.7 million <br /> • Alternative G - $6.1 million <br /> • Alternative H - $6.2 million <br /> • Alternative I - $8.0 million <br /> • Alternative j - $3.8 million <br /> Recommendations <br /> From the standpoint of benefit/cost comparison,none of the alternatives aze warranted. However, <br /> from the standpoint of addressing the five project objectives, Alternative F addresses all the <br /> guidelines,with minimal traffic impact and at a moderate cost,and is therefore recommended. The <br /> typical section for this improvement would include a 36 foot wide 21ane roadway and an 8 foot bike <br /> path. <br /> Bucher, Willis&Ratliff-3 <br /> ��.smwm worn�osc�n.�asuw <br />