My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R94-138 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1994
>
R94-138 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 9:40:00 AM
Creation date
7/13/2016 9:39:59 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R94-138
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF CONTRACT COMMUNITY DEVELOPMENT BLOCK GRANT PROJECT GALLERY 510 / 510 WEST DECATUR STREET
Approved Date
9/19/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 1 <br /> . . 782 E WOOD ST. PH.(21T)42t-2426 <br /> �ECATUR,IL 62523 FAX(21�425i906 <br /> CONTRACTOR 1 DEVELOPER <br /> CONTRACT PROPOSAL � PAGE 1 OF 3 <br /> AUGUST 22, 1994 <br /> We herewith su� ,oposal for materiais and labor to be supplied at the sole request <br /> and order of: <br /> GALLERY 510 ARTS GUILD, LTD. Job Address: <br /> 510 West Decatur Street 510 West Decatur Street <br /> Decatur, Illinois 62522 Decatur, Illinois 62522 <br /> Phone-422-15J9 <br /> hereinafter referred to as owner for work to be performed at premises set forth above - <br /> according to the fotlowing terms and specificafions: <br /> OPTION 1: REPLACE RAILINGS ON WRAP-AROUND PORCH <br /> Construet new porch railings to all areas, except where existing rail is in place. � <br /> Style of new rail is to match existing as close as possible. <br /> Materials to be used will be construction grade Redwood to allow for painting. <br /> Construct one new handrai{ to both sets of steps, style to match new porch rail. <br /> Paint new handrail with one coat of primer and one coat of finish paint. <br /> Leave all areas neat and clean, disposing of all debris generated during the course of <br /> this work. <br /> No sales tax is included in t�is bid. <br /> If painting is not required, deduct $402.00 from TOTAL MATERIAL AND LABOR. <br /> TOTAL MATERIAL AND LABOR: 54�258.89 <br /> OPTION 2.a.: SEAL FLOOR OF WRAP AROUND PORCH <br /> Sand all areas of porch to remove any and all contaminates to insure proper bondage. <br /> Prime all areas with Monobond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.